HTS Heading 4302
Tanned or dressed furskins (including heads, tails, paws and other pieces or cuttings), unassembled, or assembled (without the addition of other materials) other than those of heading 4303
All 17 HTS codes under heading 4302 (tanned or dressed furskins), with their duty rates from the 2026 HTS Revision 23. General duty 1.5% to 5.6%.
Every line of heading 4302
- 4302 Tanned or dressed furskins (including heads, tails, paws and other pieces or cuttings), unassembled, or assembled (without the addition of other materials) other than those of heading 4303.
- 4302.11.00 Of mink (under: Whole skins, with or without head, tail or paws, not assembled): General 2.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4302.11.00.10 Kolinsky (under: Of mink) (No.).
- 4302.11.00.20 Other (under: Of mink) (No.).
- 4302.19 Other (under: Whole skins, with or without head, tail or paws, not assembled).
- 4302.19.13.00 Of lamb, the following: Astrakhan, Broadtail, Caracul, Persian and similar lamb, Indian, Chinese, Mongolian or Tibetan lamb (No.): General 2.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 4302.19.15.00 Of silver, black or platinum fox (including those of any fox which is a mutation, or type developed, from silver, black or platinum foxes) (No.): General 5.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 4302.19.30 Not dyed (under: Other): General 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4302.19.30.30 Fox (under: Not dyed) (No.).
- 4302.19.30.40 Racoon (under: Not dyed) (No.).
- 4302.19.30.70 Other (under: Not dyed) (No.).
- 4302.19.45 Dyed (under: Other): General 2.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 4302.19.45.30 Fox (under: Dyed) (No.).
- 4302.19.45.40 Racoon (under: Dyed) (No.).
- 4302.19.45.70 Other (under: Dyed) (No.).
- 4302.19.55.00 Of rabbit or hare (under: Other) (No.): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4302.19.60.00 Not dyed (under: Other) (No.): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4302.19.75.00 Dyed (under: Other) (No.): General 1.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 4302.20 Heads, tails, paws and other pieces or cuttings, not assembled.
- 4302.20.30.00 Of beaver, Caracul or Persian lamb, chinchilla, ermine, fisher, fitch, fox, Kolinsky, leopard, lynx, marten, mink, nutria, ocelot, otter, pony, racoon, sable or wolf (kg): General 2.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4302.20.60.00 Not dyed (under: Other) (kg): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4302.20.90.00 Dyed (under: Other) (kg): General 1.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 4302.30.00.00 Whole skins and pieces or cuttings thereof, assembled (kg): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.