HTS Heading 4501
Natural cork, raw or simply prepared; waste cork; crushed, granulated or ground cork
All 3 HTS codes under heading 4501 (natural cork, raw or simply prepared), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4501
- 4501 Natural cork, raw or simply prepared; waste cork; crushed, granulated or ground cork.
- 4501.10.00.00 Natural cork, raw or simply prepared (kg): General Free; Special none; Column 2 Free.
- 4501.90 Other (under: Natural cork, raw or simply prepared; waste cork; crushed, granulated or ground cork).
- 4501.90.20.00 Waste cork (under: Other) (kg): General Free; Special none; Column 2 Free.
- 4501.90.40.00 Crushed, granulated or ground cork (kg): General Free; Special none; Column 2 6.6¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.