HTS Heading 4421

Other articles of wood

All 42 HTS codes under heading 4421 (other articles of wood), with their duty rates from the 2026 HTS Revision 23. General duty Free to 10.7%, some per unit.

Every line of heading 4421

  • 4421 Other articles of wood.
  • 4421.10.00.00 Clothes hangers (under: Other articles of wood) (hundreds): General 3.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4421.20 Coffins (under: Other articles of wood).
  • 4421.20.10.00 Of bamboo (under: Coffins) (No.): General 3.3%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4421.20.20.00 Other (under: Coffins) (No.): General 3.3%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4421.91 Of bamboo (under: Other).
  • 4421.91.10.00 Plain (under: Wood dowel pins) (m): General Free; Special none; Column 2 5%.
  • 4421.91.20.00 Sanded, grooved or otherwise advanced in condition (m): General 4.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4421.91.30.00 Consisting of wooden frames in the center of which are fixed louver boards or slats, with or without their hardware (No.): General 10.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4421.91.40.00 Other (under: Wood blinds, shutters, screens and shades, all the foregoing with or without their hardware) (No.): General 5.1%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 4421.91.50.00 Toothpicks (under: Toothpicks, skewers, candy sticks, ice cream sticks, tongue depressors, drink mixers and similar small wares) (kg): General Free; Special none; Column 2 25%.
  • 4421.91.60.00 Other (under: Toothpicks, skewers, candy sticks, ice cream sticks, tongue depressors, drink mixers and similar small wares) (kg): General 5.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4421.91.70 Pickets, palings, posts and rails, the foregoing which are sawn; assembled fence sections: General Free; Special none; Column 2 Free.
  • 4421.91.70.20 Assembled fence sections (under: Pickets, palings, posts and rails, the foregoing which are sawn; assembled fence sections) (No.).
  • 4421.91.70.40 Other (under: Pickets, palings, posts and rails, the foregoing which are sawn; assembled fence sections) (No.).
  • 4421.91.80 Spring-type (under: Clothespins): General 6.5¢/gross; Special Free (A+,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20¢/gross.
  • 4421.91.80.24 Valued not over 80¢/gross (under: Spring-type) (gross).
  • 4421.91.80.27 Valued over 80¢ but not over $1.35/gross (gross).
  • 4421.91.80.30 Valued over $1.35 but not over $1.70/gross (gross).
  • 4421.91.80.33 Valued over $1.70/gross (under: Spring-type) (gross).
  • 4421.91.85.00 Other (under: Clothespins) (gross): General 4.8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 4421.91.88.00 Canoe paddles (under: Of bamboo) (No.): General Free; Special none; Column 2 35%.
  • 4421.91.93.00 Theatrical, ballet, and operatic scenery and properties, including sets (kg): General Free; Special none; Column 2 33 1/3%.
  • 4421.91.94.00 Edge-glued lumber (under: Other) (m3): General Free; Special none; Column 2 10%.
  • 4421.91.98 Other (under: Other): General 3.3%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4421.91.98.20 Pencil slats (under: Other) (gross).
  • 4421.91.98.70 Gates for confining children or pets (No.).
  • 4421.91.98.80 Other (under: Other) (kg).
  • 4421.99 Other (under: Other).
  • 4421.99.10.00 Coniferous (under: Plain) (m): General Free; Special none; Column 2 5%.
  • 4421.99.15.00 Other (under: Plain) (m): General Free; Special none; Column 2 5%.
  • 4421.99.20.00 Sanded, grooved or otherwise advanced in condition (m): General 4.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4421.99.30.00 Consisting of wooden frames in the center of which are fixed louver boards or slats, with or without their hardware (No.): General 10.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4421.99.40.00 Other (under: Wood blinds, shutters, screens and shades, all the foregoing with or without their hardware) (No.): General 5.1%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 4421.99.50.00 Toothpicks (under: Toothpicks, skewers, candy sticks, ice cream sticks, tongue depressors, drink mixers and similar small wares) (kg): General Free; Special none; Column 2 25%.
  • 4421.99.60.00 Other (under: Toothpicks, skewers, candy sticks, ice cream sticks, tongue depressors, drink mixers and similar small wares) (kg): General 5.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4421.99.70 Pickets, palings, posts and rails, the foregoing which are sawn; assembled fence sections: General Free; Special none; Column 2 Free.
  • 4421.99.70.20 Assembled fence sections (under: Pickets, palings, posts and rails, the foregoing which are sawn; assembled fence sections) (No.).
  • 4421.99.70.40 Other (under: Pickets, palings, posts and rails, the foregoing which are sawn; assembled fence sections) (No.).
  • 4421.99.80 Spring-type (under: Clothespins): General 6.5¢/gross; Special Free (A+,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20¢/gross.
  • 4421.99.80.24 Valued not over 80¢/gross (under: Spring-type) (gross).
  • 4421.99.80.27 Valued over 80¢ but not over $1.35/gross (gross).
  • 4421.99.80.30 Valued over $1.35 but not over $1.70/gross (gross).
  • 4421.99.80.33 Valued over $1.70/gross (under: Spring-type) (gross).
  • 4421.99.85.00 Other (under: Clothespins) (gross): General 4.8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 4421.99.88.00 Canoe paddles (under: Other) (No.): General Free; Special none; Column 2 35%.
  • 4421.99.93.00 Theatrical, ballet, and operatic scenery and properties, including sets (kg): General Free; Special none; Column 2 33 1/3%.
  • 4421.99.94.00 Edge-glued lumber (under: Other) (m3): General Free; Special none; Column 2 10%.
  • 4421.99.98 Other (under: Other): General 3.3%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4421.99.98.20 Pencil slats (under: Other) (gross).
  • 4421.99.98.70 Gates for confining children or pets (No.).
  • 4421.99.98.80 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.