HTS Heading 4503

Articles of natural cork

All 7 HTS codes under heading 4503 (articles of natural cork), with their duty rates from the 2026 HTS Revision 23. General duty Free to 14%.

Every line of heading 4503

  • 4503 Articles of natural cork.
  • 4503.10 Corks and stoppers (under: Articles of natural cork).
  • 4503.10.20.00 With maximum diameter not over 19 mm (kg): General Free; Special none; Column 2 68¢/kg.
  • 4503.10.30.00 Wholly of cork, of a thickness (or length) greater than the maximum diameter (kg): General Free; Special none; Column 2 55¢/kg.
  • 4503.10.40.00 Other (under: Other) (kg): General Free; Special none; Column 2 55¢/kg.
  • 4503.10.60.00 Other (under: Corks and stoppers) (kg): General Free; Special none; Column 2 55¢/kg.
  • 4503.90 Other (under: Articles of natural cork).
  • 4503.90.20.00 Disks, wafers and washers (under: Other) (kg): General Free; Special none; Column 2 55¢/kg.
  • 4503.90.40.00 Wallcoverings, backed with paper or otherwise reinforced (kg): General Free; Special none; Column 2 3.3¢/kg + 20%.
  • 4503.90.60.00 Other (under: Other) (kg): General 14%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.