HTS Heading 4504
Agglomerated cork (with or without a binding substance) and articles of agglomerated cork
All 8 HTS codes under heading 4504 (agglomerated cork), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4504
- 4504 Agglomerated cork (with or without a binding substance) and articles of agglomerated cork.
- 4504.10 Blocks, plates, sheets and strip; tiles of any shape; solid cylinders, including disks.
- 4504.10.10.00 Vulcanized sheets and slabs wholly of ground or pulverized cork and rubber (kg): General Free; Special none; Column 2 25%.
- 4504.10.20.00 Insulation, coated or not coated, of compressed cork (m3, kg): General Free; Special none; Column 2 Free.
- 4504.10.30.00 Floor coverings (under: Blocks, plates, sheets and strip; tiles of any shape; solid cylinders, including disks) (kg): General Free; Special none; Column 2 22¢/kg.
- 4504.10.40.00 Wallcoverings, backed with paper or otherwise reinforced (kg): General Free; Special none; Column 2 3.3¢/kg + 20%.
- 4504.10.45.00 Stoppers, not tapered, wholly of cork, of a thickness (or length) greater than the maximum diameter (kg): General Free; Special none; Column 2 55¢/kg.
- 4504.10.47.00 Other (under: Corks, stoppers, disks, wafers and washers) (kg): General Free; Special none; Column 2 55¢/kg.
- 4504.10.50.00 Other (under: Blocks, plates, sheets and strip; tiles of any shape; solid cylinders, including disks) (kg): General Free; Special none; Column 2 45%.
- 4504.90.00.00 Other (under: Agglomerated cork (with or without a binding substance) and articles of agglomerated cork) (kg): General Free; Special none; Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.