HTS Heading 4601

Plaits and similar products of plaiting materials, whether or not assembled into strips; plaiting materials, plaits and similar products of plaiting materials, bound together in parallel strands or woven, in sheet form, whether or not being finished articles (for example, mats, matting, screens)

All 20 HTS codes under heading 4601 (plaits and similar products), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8%.

Every line of heading 4601

  • 4601 Plaits and similar products of plaiting materials, whether or not assembled into strips; plaiting materials, plaits and similar products of plaiting materials, bound together in parallel strands or woven, in sheet form, whether or not being finished articles (for example, mats, matting, screens).
  • 4601.21 Of bamboo (under: Mats, matting and screens of vegetable materials).
  • 4601.21.40.00 Woven or partly assembled (under: Of bamboo) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 4601.21.80.00 Floor coverings (under: Other) (kg): General Free; Special none; Column 2 40%.
  • 4601.21.90.00 Other (under: Other) (kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 4601.22 Of rattan (under: Mats, matting and screens of vegetable materials).
  • 4601.22.40.00 Woven or partly assembled (under: Of rattan) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 4601.22.80.00 Floor coverings (under: Other) (kg): General Free; Special none; Column 2 40%.
  • 4601.22.90.00 Other (under: Other) (kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 4601.29 Other (under: Mats, matting and screens of vegetable materials).
  • 4601.29.40.00 Of willow (under: Woven or partly assembled) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 4601.29.60.00 Other (under: Woven or partly assembled) (kg): General 4.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 4601.29.80.00 Floor coverings (under: Other) (kg): General Free; Special none; Column 2 40%.
  • 4601.29.90.00 Other (under: Other) (kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 4601.92 Of bamboo (under: Other).
  • 4601.92.05.00 Plaits and similar products of plaiting materials, whether or not assembled into strips (kg): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 4601.92.20.00 Other (under: Of bamboo) (kg): General 6.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 4601.93 Of rattan (under: Other).
  • 4601.93.01.00 Webbing (under: Of rattan) (m2): General Free; Special none; Column 2 20%.
  • 4601.93.05.00 Plaits and similar products of plaiting materials, whether or not assembled into strips (kg): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 4601.93.20.00 Other (under: Of rattan) (kg): General 6.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 4601.94 Of other vegetable materials (under: Other).
  • 4601.94.05.00 Plaits and similar products of plaiting materials, whether or not assembled into strips (kg): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 4601.94.20.00 Of willow or wood (under: Other) (kg): General 6.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 4601.94.40.00 Other (under: Other) (kg): General Free; Special none; Column 2 25%.
  • 4601.99 Other (under: Other).
  • 4601.99.05.00 Plaits and similar products of plaiting materials, whether or not assembled into strips (kg): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 4601.99.90.00 Other (under: Other) (kg): General 3.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.