HTS Heading 4702
Chemical woodpulp, dissolving grades
All 2 HTS codes under heading 4702 (chemical woodpulp, dissolving grades), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4702
- 4702.00.00 Chemical woodpulp, dissolving grades: General Free; Special none; Column 2 Free.
- 4702.00.00.20 Sulfite (under: Chemical woodpulp, dissolving grades) (t adw).
- 4702.00.00.40 Sulfate or soda (under: Chemical woodpulp, dissolving grades) (t adw).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.