HTS Chapter 47
Pulp of wood or other fibrous cellulosic material; recovered paper or paperboard
The 7 headings and 26 HTS codes of chapter 47 (pulp of wood or other fibrous cellulosic material), with their duty rates from the 2026 HTS Revision 23.
The 7 headings of chapter 47
- 4701: Mechanical woodpulp (1 code, General duty Free)
- 4702: Chemical woodpulp, dissolving grades (2 codes, General duty Free)
- 4703: Chemical woodpulp, soda or sulfate, other than dissolving grades (6 codes, General duty Free)
- 4704: Chemical woodpulp, sulfite, other than dissolving grades (4 codes, General duty Free)
- 4705: Wood pulp obtained by a combination of mechanical and chemical pulping processes (1 code, General duty Free)
- 4706: Pulps of fibers derived from recovered (waste and scrap) paper or paperboard or of other fibrous cellulosic material (6 codes, General duty Free)
- 4707: Recovered (waste and scrap) paper and paperboard (6 codes, General duty Free)
Where it sits in the schedule
Chapter 47 is in Section X of the Harmonized System, pulp, paper and printed matter (chapters 47 to 49). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.