HTS Heading 4811
Paper, paperboard, cellulose wadding and webs of cellulose fibers, coated, impregnated, covered, surface-colored, surface-decorated or printed, in rolls or rectangular (including square) sheets, of any size, other than goods of the kind described in heading 4803, 4809 or 4810
All 35 HTS codes under heading 4811 (paper, paperboard), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4811
- 4811 Paper, paperboard, cellulose wadding and webs of cellulose fibers, coated, impregnated, covered, surface-colored, surface-decorated or printed, in rolls or rectangular (including square) sheets, of any size, other than goods of the kind described in heading 4803, 4809 or 4810.
- 4811.10 Tarred, bituminized or asphalted paper and paperboard.
- 4811.10.11.00 In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state (kg): General Free; Special none; Column 2 10%.
- 4811.10.21.00 Other (under: Tarred, bituminized or asphalted paper and paperboard) (kg): General Free; Special none; Column 2 26.5%.
- 4811.41 Self-adhesive (under: Gummed or adhesive paper and paperboard).
- 4811.41.10.00 In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state (kg): General Free; Special none; Column 2 40%.
- 4811.41.21.00 In strips or rolls (under: Other) (kg): General Free; Special none; Column 2 40%.
- 4811.41.30.00 Other (under: Other) (kg): General Free; Special none; Column 2 35%.
- 4811.49 Other (under: Gummed or adhesive paper and paperboard).
- 4811.49.10.00 In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state (kg): General Free; Special none; Column 2 14%.
- 4811.49.21.00 In strips or rolls (under: Other) (kg): General Free; Special none; Column 2 30%.
- 4811.49.30.00 Other (under: Other) (kg): General Free; Special none; Column 2 35%.
- 4811.51 Bleached, weighing more than 150 g/m².
- 4811.51.20 0.3 mm or more in thickness (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state): General Free; Special none; Column 2 30%.
- 4811.51.20.10 Base stock for milk cartons and other beverage containers (kg).
- 4811.51.20.20 Folding carton stock (under: Other) (kg).
- 4811.51.20.30 Base stock for trays, dishes, plates, cups and the like (kg).
- 4811.51.20.40 Base stock for packaging (under: Other) (kg).
- 4811.51.20.50 Other (under: Other) (kg).
- 4811.51.40.00 Other (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg): General Free; Special none; Column 2 42%.
- 4811.51.60.00 Other (under: Bleached, weighing more than 150 g/m²) (kg): General Free; Special none; Column 2 35%.
- 4811.59 Other (under: Paper and paperboard, coated, impregnated or covered with plastics (excluding adhesives)).
- 4811.59.20.00 Printing paper (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg): General Free; Special none; Column 2 37%.
- 4811.59.40 Other (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state): General Free; Special none; Column 2 25%.
- 4811.59.40.20 Folding carton stock (under: Other) (kg).
- 4811.59.40.40 Other (under: Other) (kg).
- 4811.59.60.00 Other (under: Other) (kg): General Free; Special none; Column 2 35%.
- 4811.60 Paper and paperboard, coated, impregnated or covered with wax, paraffin, stearin, oil or glycerol.
- 4811.60.40.00 In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state (kg): General Free; Special none; Column 2 17.5%.
- 4811.60.60.00 Other (under: Paper and paperboard, coated, impregnated or covered with wax, paraffin, stearin, oil or glycerol) (kg): General Free; Special none; Column 2 35%.
- 4811.90 Other paper, paperboard, cellulose wadding and webs of cellulose fibers.
- 4811.90.10.00 Handmade paper (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg): General Free; Special none; Column 2 27%.
- 4811.90.20.00 Wholly or partly covered with flock, gelatin, metal or metal solutions (kg): General Free; Special none; Column 2 22.5%.
- 4811.90.30.00 Impregnated with latex (under: Other) (kg): General Free; Special none; Column 2 25%.
- 4811.90.40 Weighing not over 15 g/m² (under: Other): General Free; Special none; Column 2 30%.
- 4811.90.40.10 Tissue papers, in sheets (under: Weighing not over 15 g/m²) (kg).
- 4811.90.40.90 Other (under: Weighing not over 15 g/m²) (kg).
- 4811.90.60 Weighing over 15 g/m² but not over 30 g/m²: General Free; Special none; Column 2 20%.
- 4811.90.60.10 Tissue papers having a basis weight not exceeding 29 g/m², in sheets (kg).
- 4811.90.60.90 Other (under: Weighing over 15 g/m² but not over 30 g/m²) (kg).
- 4811.90.80 Weighing over 30 g/m² (under: Other): General Free; Special none; Column 2 18.5%.
- 4811.90.80.20 Gift Wrap (other than tissue) (kg).
- 4811.90.80.30 Direct thermal coated paper (under: Weighing over 30 g/m²) (kg).
- 4811.90.80.50 Other (under: Weighing over 30 g/m²) (kg).
- 4811.90.90 Other (under: Other paper, paperboard, cellulose wadding and webs of cellulose fibers): General Free; Special none; Column 2 35%.
- 4811.90.90.10 Tissue papers having a basis weight not exceeding 29 g/m², in sheets (kg).
- 4811.90.90.30 Direct thermal coated paper (under: Other) (kg).
- 4811.90.90.35 Paper in sheets, lined or ruled, having a width of 152.4 to 360 mm inclusive and a length of 225.25 to 360 mm inclusive (kg).
- 4811.90.90.80 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.