HTS Heading 4810

Paper and paperboard, coated on one or both sides with kaolin (China clay) or other inorganic substances, with or without a binder, and with no other coating, whether or not surface-colored, surface-decorated or printed, in rolls or rectangular (including square) sheets, of any size

All 65 HTS codes under heading 4810 (paper and paperboard), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4810

  • 4810 Paper and paperboard, coated on one or both sides with kaolin (China clay) or other inorganic substances, with or without a binder, and with no other coating, whether or not surface-colored, surface-decorated or printed, in rolls or rectangular (including square) sheets, of any size.
  • 4810.13 In rolls (under: Paper and paperboard of a kind used for writing, printing or other graphic purposes, not containing fibers obtained by a mechanical or chemi-mechanical process or of which not more than 10 percent by weight of the total fiber content consists of such fibers).
  • 4810.13.11 Basic paper to be sensitized for use in photography: General Free; Special none; Column 2 5%.
  • 4810.13.11.20 Baryta coated (under: Basic paper to be sensitized for use in photography) (kg, m²).
  • 4810.13.11.40 Other (under: Basic paper to be sensitized for use in photography) (kg, m²).
  • 4810.13.13.00 India or bible paper (under: Weighing not more than 150 g/m²) (kg): General Free; Special none; Column 2 24%.
  • 4810.13.19.00 Other (under: Weighing not more than 150 g/m²) (kg): General Free; Special none; Column 2 37%.
  • 4810.13.20 Weighing more than 150 g/m² (under: Of a width exceeding 15 cm): General Free; Special none; Column 2 42%.
  • 4810.13.20.10 Coated on one side only (under: Weighing more than 150 g/m²) (kg).
  • 4810.13.20.90 Other (under: Weighing more than 150 g/m²) (kg).
  • 4810.13.50.00 Printed, embossed or perforated (kg): General Free; Special none; Column 2 30%.
  • 4810.13.60.00 Basic paper to be sensitized for use in photography (kg, m²): General Free; Special none; Column 2 5%.
  • 4810.13.70 Other (under: Other): General Free; Special none; Column 2 30%.
  • 4810.13.70.20 Containing by weight 25 percent or more cotton fiber (kg).
  • 4810.13.70.40 Other (under: Other) (kg).
  • 4810.14 In sheets with one side not exceeding 435 mm and the other side not exceeding 297 mm in the unfolded state.
  • 4810.14.11 Basic paper to be sensitized for use in photography: General Free; Special none; Column 2 5%.
  • 4810.14.11.20 Baryta coated (under: Basic paper to be sensitized for use in photography) (kg, m²).
  • 4810.14.11.40 Other (under: Basic paper to be sensitized for use in photography) (kg, m²).
  • 4810.14.13.00 India or bible paper (under: Weighing not more than 150 g/m²) (kg): General Free; Special none; Column 2 24%.
  • 4810.14.19.00 Other (under: Weighing not more than 150 g/m²) (kg): General Free; Special none; Column 2 37%.
  • 4810.14.20 Weighing more than 150 g/m² (under: With one side exceeding 360 mm and the other side exceeding 150 mm in the unfolded state): General Free; Special none; Column 2 42%.
  • 4810.14.20.10 Coated on one side only (under: Weighing more than 150 g/m²) (kg).
  • 4810.14.20.90 Other (under: Weighing more than 150 g/m²) (kg).
  • 4810.14.50.00 Printed, embossed or perforated (kg): General Free; Special none; Column 2 30%.
  • 4810.14.60.00 Basic paper to be sensitized for use in photography (kg, m²): General Free; Special none; Column 2 5%.
  • 4810.14.70 Other (under: Other): General Free; Special none; Column 2 30%.
  • 4810.14.70.20 Containing by weight 25 percent or more cotton fiber (kg).
  • 4810.14.70.40 Other (under: Other) (kg).
  • 4810.19 Other (under: Paper and paperboard of a kind used for writing, printing or other graphic purposes, not containing fibers obtained by a mechanical or chemi-mechanical process or of which not more than 10 percent by weight of the total fiber content consists of such fibers).
  • 4810.19.11.00 Basic paper to be sensitized for use in photography (kg, m²): General Free; Special none; Column 2 5%.
  • 4810.19.13.00 India or bible paper (under: Weighing not more than 150 g/m²) (kg): General Free; Special none; Column 2 24%.
  • 4810.19.19.00 Other (under: Weighing not more than 150 g/m²) (kg): General Free; Special none; Column 2 37%.
  • 4810.19.20 Weighing more than 150 g/m² (under: Other): General Free; Special none; Column 2 42%.
  • 4810.19.20.10 Coated on one side only (under: Weighing more than 150 g/m²) (kg).
  • 4810.19.20.90 Other (under: Weighing more than 150 g/m²) (kg).
  • 4810.22 Light-weight coated paper (under: Paper and paperboard of a kind used for writing, printing or other graphic purposes, of which more than 10 percent by weight of the total fiber content consists of fibers obtained by a mechanical or chemi-mechanical process).
  • 4810.22.10.00 In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state (kg): General Free; Special none; Column 2 37%.
  • 4810.22.50 Printed, embossed or perforated: General Free; Special none; Column 2 30%.
  • 4810.22.50.44 Hole-punched looseleaf paper (under: Printed, embossed or perforated) (kg).
  • 4810.22.50.80 Other (under: Printed, embossed or perforated) (kg).
  • 4810.22.60.00 Basic paper to be sensitized for use in photography (kg, m²): General Free; Special none; Column 2 5%.
  • 4810.22.70 Other (under: Other): General Free; Special none; Column 2 30%.
  • 4810.22.70.20 Containing by weight 25 percent or more cotton fiber (kg).
  • 4810.22.70.40 Other (under: Other) (kg).
  • 4810.29 Other (under: Paper and paperboard of a kind used for writing, printing or other graphic purposes, of which more than 10 percent by weight of the total fiber content consists of fibers obtained by a mechanical or chemi-mechanical process).
  • 4810.29.10 In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state: General Free; Special none; Column 2 37%.
  • 4810.29.10.25 In rolls (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg).
  • 4810.29.10.35 In sheets (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg).
  • 4810.29.50.00 Printed, embossed or perforated (kg): General Free; Special none; Column 2 30%.
  • 4810.29.60.00 Basic paper to be sensitized for use in photography (kg, m²): General Free; Special none; Column 2 5%.
  • 4810.29.70 Other (under: Other): General Free; Special none; Column 2 30%.
  • 4810.29.70.20 Containing by weight 25 percent or more cotton fiber (kg).
  • 4810.29.70.25 In rolls (under: Other) (kg).
  • 4810.29.70.35 In sheets (under: Other) (kg).
  • 4810.31 Bleached uniformly throughout the mass and of which more than 95 percent by weight of the total fiber content consists of wood fibers obtained by a chemical process and weighing 150 g/m² or less.
  • 4810.31.10 In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state: General Free; Special none; Column 2 25%.
  • 4810.31.10.20 Folding carton stock (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg).
  • 4810.31.10.40 Base stock for trays, dishes, plates, cups and the like (kg).
  • 4810.31.10.50 Gift wrap (under: Other) (kg).
  • 4810.31.10.80 Other (under: Other) (kg).
  • 4810.31.30.00 Cards, not punched, for punchcard machines, whether or not in strips (kg): General Free; Special none; Column 2 30%.
  • 4810.31.65.00 Other (under: Other) (kg): General Free; Special none; Column 2 26.5%.
  • 4810.32 Bleached uniformly throughout the mass and of which more than 95 percent by weight of the total fiber content consists of wood fibers obtained by a chemical process and weighing more than 150 g/m².
  • 4810.32.10 In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state: General Free; Special none; Column 2 25%.
  • 4810.32.10.20 Folding carton stock (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg).
  • 4810.32.10.40 Base stock for trays, dishes, plates, cups and the like (kg).
  • 4810.32.10.60 Other (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg).
  • 4810.32.30.00 Cards, not punched, for punchcard machines, whether or not in strips (kg): General Free; Special none; Column 2 30%.
  • 4810.32.65.00 Other (under: Other) (kg): General Free; Special none; Column 2 26.5%.
  • 4810.39 Other (under: Kraft paper and paperboard, other than that of a kind used for writing, printing or other graphic purposes).
  • 4810.39.12.00 Whether or not impregnated, but not otherwise treated (kg): General Free; Special none; Column 2 25%.
  • 4810.39.14.00 Other (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg): General Free; Special none; Column 2 20%.
  • 4810.39.30.00 Cards, not punched, for punchcard machines, whether or not in strips (kg): General Free; Special none; Column 2 30%.
  • 4810.39.65.00 Other (under: Other) (kg): General Free; Special none; Column 2 26.5%.
  • 4810.92 Multi-ply (under: Other paper and paperboard).
  • 4810.92.12 Weighing more than 150 g/m² (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state): General Free; Special none; Column 2 30%.
  • 4810.92.12.25 In rolls (under: Weighing more than 150 g/m²) (kg).
  • 4810.92.12.35 In sheets (under: Weighing more than 150 g/m²) (kg).
  • 4810.92.14 Other (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state): General Free; Special none; Column 2 20%.
  • 4810.92.14.25 In rolls (under: Other) (kg).
  • 4810.92.14.35 In sheets (under: Other) (kg).
  • 4810.92.30.00 Cards, not punched, for punch card machines, whether or not in strips (kg): General Free; Special none; Column 2 30%.
  • 4810.92.65 Other (under: Other): General Free; Special none; Column 2 26.5%.
  • 4810.92.65.25 In rolls (under: Other) (kg).
  • 4810.92.65.35 In sheets (under: Other) (kg).
  • 4810.99 Other (under: Other paper and paperboard).
  • 4810.99.10 In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state: General Free; Special none; Column 2 20%.
  • 4810.99.10.10 Gift wrap paper (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg).
  • 4810.99.10.50 Folding Carton (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg).
  • 4810.99.10.60 Other (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg).
  • 4810.99.30.00 Cards, not punched, for punch card machines, whether or not in strips (kg): General Free; Special none; Column 2 30%.
  • 4810.99.65.00 Other (under: Other) (kg): General Free; Special none; Column 2 26.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.