HTS Heading 4813
Cigarette paper, whether or not cut to size or in the form of booklets or tubes
All 3 HTS codes under heading 4813 (cigarette paper), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4813
- 4813 Cigarette paper, whether or not cut to size or in the form of booklets or tubes.
- 4813.10.00.00 In the form of booklets or tubes (kg): General Free; Special none; Column 2 60%.
- 4813.20.00.00 In rolls of a width not exceeding 5 cm (kg): General Free; Special none; Column 2 60%.
- 4813.90.00.00 Other (under: Cigarette paper, whether or not cut to size or in the form of booklets or tubes) (kg): General Free; Special none; Column 2 60%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.