HTS Heading 4814
Wallpaper and similar wallcoverings; window transparencies of paper
All 2 HTS codes under heading 4814 (wallpaper and similar wallcoverings), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4814
- 4814 Wallpaper and similar wallcoverings; window transparencies of paper.
- 4814.20.00.00 Wallpaper and similar wallcoverings, consisting of paper coated or covered, on the face side, with a grained, embossed, colored, design-printed or otherwise decorated layer of plastics (kg): General Free; Special none; Column 2 3.3¢/kg + 20%.
- 4814.90.02.00 Other (under: Wallpaper and similar wallcoverings; window transparencies of paper) (kg): General Free; Special none; Column 2 3.3¢/kg + 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.