HTS Heading 4821
Paper and paperboard labels of all kinds, whether or not printed
All 4 HTS codes under heading 4821 (paper and paperboard labels of all kinds), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4821
- 4821 Paper and paperboard labels of all kinds, whether or not printed.
- 4821.10 Printed (under: Paper and paperboard labels of all kinds, whether or not printed).
- 4821.10.20.00 Printed in whole or in part by a lithographic process (kg): General Free; Special none; Column 2 88¢/kg.
- 4821.10.40.00 Other (under: Printed) (kg): General Free; Special none; Column 2 35%.
- 4821.90 Other (under: Paper and paperboard labels of all kinds, whether or not printed).
- 4821.90.20.00 Self-adhesive (under: Other) (kg): General Free; Special none; Column 2 40%.
- 4821.90.40.00 Other (under: Other) (kg): General Free; Special none; Column 2 30%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.