HTS Heading 4822

Bobbins, spools, cops and similar supports of paper pulp, paper or paperboard (whether or not perforated or hardened)

All 2 HTS codes under heading 4822 (bobbins, spools), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4822

  • 4822 Bobbins, spools, cops and similar supports of paper pulp, paper or paperboard (whether or not perforated or hardened).
  • 4822.10.00.00 Of a kind used for winding textile yarn (kg): General Free; Special none; Column 2 43%.
  • 4822.90.00.00 Other (under: Bobbins, spools, cops and similar supports of paper pulp, paper or paperboard (whether or not perforated or hardened)) (kg): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.