HTS Heading 4904
Music, printed or in manuscript, whether or not bound or illustrated
All 2 HTS codes under heading 4904 (music, printed or in manuscript), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4904
- 4904.00.00 Music, printed or in manuscript, whether or not bound or illustrated: General Free; Special none; Column 2 Free.
- 4904.00.00.20 Sheet music, whether or not stapled or folded, but not otherwise bound (kg).
- 4904.00.00.40 Other (under: Music, printed or in manuscript, whether or not bound or illustrated) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.