HTS Heading 4905

Maps and hydrographic or similar charts of all kinds, including atlases, wall maps, topographical plans and globes, printed

All 3 HTS codes under heading 4905 (maps and hydrographic), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4905

  • 4905 Maps and hydrographic or similar charts of all kinds, including atlases, wall maps, topographical plans and globes, printed.
  • 4905.20.00.00 In book form (under: Maps and hydrographic or similar charts of all kinds, including atlases, wall maps, topographical plans and globes, printed) (No.): General Free; Special none; Column 2 Free.
  • 4905.90 Other (under: Maps and hydrographic or similar charts of all kinds, including atlases, wall maps, topographical plans and globes, printed).
  • 4905.90.20.00 Globes (under: Other) (kg): General Free; Special none; Column 2 35%.
  • 4905.90.60.00 Other (under: Other) (kg): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.