HTS Heading 4910

Calendars of any kind, printed, including calendar blocks

All 3 HTS codes under heading 4910 (calendars of any kind, printed), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4910

  • 4910.00 Calendars of any kind, printed, including calendar blocks.
  • 4910.00.20.00 Not over 0.51 mm in thickness (kg): General Free; Special none; Column 2 66¢/kg.
  • 4910.00.40.00 Over 0.51 mm in thickness (under: Printed on paper or paperboard in whole or in part by a lithographic process) (kg): General Free; Special none; Column 2 19¢/kg.
  • 4910.00.60.00 Other (under: Calendars of any kind, printed, including calendar blocks) (kg): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.