HTS Heading 4911

Other printed matter, including printed pictures and photographs

All 14 HTS codes under heading 4911 (other printed matter), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4911

  • 4911 Other printed matter, including printed pictures and photographs.
  • 4911.10.00 Trade advertising material, commercial catalogs and the like: General Free; Special none; Column 2 Free.
  • 4911.10.00.20 Printed catalogs relating principally to current offers for the sale of United States products (No.).
  • 4911.10.00.40 Printed catalogs, price lists or trade notices, relating to offers, by a person whose principal place of business or bonafide residence is in a foreign country, to sell or rent products of a foreign country or to furnish foreign or international transportation or commercial insurance services (No.).
  • 4911.10.00.60 Tourist and other literature (including posters), containing geographic, historical, hotel, institutional, timetable, travel or similar information, principally with respect to places, travel facilities or educational opportunities outside the customs territory of the United States (kg).
  • 4911.10.00.80 Other (under: Trade advertising material, commercial catalogs and the like) (kg).
  • 4911.91 Pictures, designs and photographs.
  • 4911.91.10.00 Printed over 20 years at time of importation (kg): General Free; Special none; Column 2 Free.
  • 4911.91.15.00 Suitable for use in the production of articles of heading 4901 (kg): General Free; Special none; Column 2 Free.
  • 4911.91.20 Not over 0.51 mm in thickness: General Free; Special none; Column 2 66¢/kg.
  • 4911.91.20.20 Posters (under: Not over 0.51 mm in thickness) (kg).
  • 4911.91.20.40 Other (under: Not over 0.51 mm in thickness) (kg).
  • 4911.91.30.00 Over 0.51 mm in thickness (under: Lithographs on paper or paperboard) (kg): General Free; Special none; Column 2 19.3¢/kg.
  • 4911.91.40 Other (under: Other): General Free; Special none; Column 2 25%.
  • 4911.91.40.20 Posters (under: Other) (kg).
  • 4911.91.40.40 Other (under: Other) (kg).
  • 4911.99 Other (under: Other).
  • 4911.99.20.00 International customs forms (carnets) and parts thereof, in English or French (whether or not in additional languages) (kg): General Free; Special none; Column 2 Free.
  • 4911.99.60.00 Printed on paper in whole or in part by a lithographic process (kg): General Free; Special none; Column 2 66¢/kg + 0.4%.
  • 4911.99.80.00 Other (under: Other) (kg): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.