HTS Heading 5003

Silk waste (including cocoons unsuitable for reeling, yarn waste and garnetted stock)

All 2 HTS codes under heading 5003 (silk waste), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.5%.

Every line of heading 5003

  • 5003.00 Silk waste (including cocoons unsuitable for reeling, yarn waste and garnetted stock).
  • 5003.00.10.00 Not carded or combed (under: Silk waste (including cocoons unsuitable for reeling, yarn waste and garnetted stock)) (kg): General Free; Special none; Column 2 Free.
  • 5003.00.90.00 Other (under: Silk waste (including cocoons unsuitable for reeling, yarn waste and garnetted stock)) (kg): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.