HTS Heading 5004

Silk yarn (other than yarn spun from silk waste) not put up for retail sale

The HTS code under heading 5004 (silk yarn), with its duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 5004

  • 5004.00.00.00 Silk yarn (other than yarn spun from silk waste) not put up for retail sale (kg): General Free; Special none; Column 2 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.