HTS Heading 5006

Silk yarn and yarn spun from silk waste, put up for retail sale; silkworm gut

All 2 HTS codes under heading 5006 (silk yarn and yarn spun from silk waste), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 5006

  • 5006.00 Silk yarn and yarn spun from silk waste, put up for retail sale; silkworm gut.
  • 5006.00.10.00 Containing 85 percent or more by weight of silk or silk waste (kg): General Free; Special none; Column 2 40%.
  • 5006.00.90.00 Other (800) (under: Silk yarn and yarn spun from silk waste, put up for retail sale; silkworm gut) (kg): General Free; Special none; Column 2 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.