HTS Heading 5007

Woven fabrics of silk or of silk waste

All 21 HTS codes under heading 5007 (woven fabrics of silk or of silk waste), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.9%.

Every line of heading 5007

  • 5007 Woven fabrics of silk or of silk waste.
  • 5007.10 Fabrics of noil silk (under: Woven fabrics of silk or of silk waste).
  • 5007.10.30 Containing 85 percent or more by weight of silk or silk waste: General 0.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 5007.10.30.20 More than 127 cm in width (under: Not jacquard woven) (m², kg).
  • 5007.10.30.40 Other (under: Not jacquard woven) (m², kg).
  • 5007.10.30.90 Other (under: Containing 85 percent or more by weight of silk or silk waste) (m², kg).
  • 5007.10.60 Other (under: Fabrics of noil silk): General 3.9%; Special Free (AU,BH, CL,CO,E*, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 90%.
  • 5007.10.60.10 Of yarns of different colors (218) (m², kg).
  • 5007.10.60.20 Other (220) (under: Subject to cotton restraints or to man-made fiber restraints) (m², kg).
  • 5007.10.60.30 Subject to wool restraints (410) (m², kg).
  • 5007.10.60.90 Other (810) (under: Other) (m², kg).
  • 5007.20.00 Other fabrics, containing 85 percent or more by weight of silk or of silk waste other than noil silk: General Free; Special none; Column 2 90%.
  • 5007.20.00.15 Measuring less than 77 cm in width or less than 77 cm between selvages, with more than 47 warp yarns per cm, of a kind for use in the manufacture of neckties (m², kg).
  • 5007.20.00.25 More than 127 cm in width (under: Other) (m², kg).
  • 5007.20.00.35 Other (under: Other) (m², kg).
  • 5007.20.00.55 Measuring less than 77 cm in width or less than 77 cm between selvages, with more than 47 warp yarns per cm, of a kind for use in the manufacture of neckties (m², kg).
  • 5007.20.00.65 More than 127 cm in width (under: Not jacquard woven) (m², kg).
  • 5007.20.00.85 Other (under: Not jacquard woven) (m², kg).
  • 5007.20.00.95 Other (under: Other) (m², kg).
  • 5007.90 Other fabrics (under: Woven fabrics of silk or of silk waste).
  • 5007.90.30 Containing 85 percent or more by weight of silk or silk waste: General 0.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 5007.90.30.20 More than 127 cm in width (under: Not jacquard woven) (m², kg).
  • 5007.90.30.40 Other (under: Not jacquard woven) (m², kg).
  • 5007.90.30.90 Other (under: Containing 85 percent or more by weight of silk or silk waste) (m², kg).
  • 5007.90.60 Other (under: Other fabrics): General 3.9%; Special Free (AU,BH, CL,CO,E*, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 90%.
  • 5007.90.60.10 Of yarns of different colors (218) (m², kg).
  • 5007.90.60.20 Other (220) (under: Subject to cotton restraints or to man-made fiber restraints) (m², kg).
  • 5007.90.60.30 Subject to wool restraints (410) (m², kg).
  • 5007.90.60.90 Other (810) (under: Other) (m², kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.