HTS Heading 5103
Waste of wool or of fine or coarse animal hair, including yarn waste but excluding garnetted stock
All 3 HTS codes under heading 5103 (waste of wool or of fine), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7%, some per unit.
Every line of heading 5103
- 5103 Waste of wool or of fine or coarse animal hair, including yarn waste but excluding garnetted stock.
- 5103.10.00.00 Noils of wool or of fine animal hair (kg): General 2.6¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50.7¢/kg.
- 5103.20.00.00 Other waste of wool or of fine animal hair (kg): General 2.6¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55.1¢/kg.
- 5103.30.00.00 Waste of coarse animal hair (under: Waste of wool or of fine or coarse animal hair, including yarn waste but excluding garnetted stock) (kg): General 7%; Special Free (AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.