HTS Heading 5102
Fine or coarse animal hair, not carded or combed
All 8 HTS codes under heading 5102 (fine or coarse animal hair), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4%, some per unit.
Every line of heading 5102
- 5102 Fine or coarse animal hair, not carded or combed.
- 5102.11 Of Kashmir (cashmere) goats (under: Fine animal hair).
- 5102.11.10.00 Not processed in any manner beyond the degreased or carbonized condition (cy kg, kg): General 5.1¢/clean kg; Special Free (AU,BH, CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 46.3¢/clean kg.
- 5102.11.90.00 Other (under: Of Kashmir (cashmere) goats) (cy kg, kg): General 4.9¢/kg + 4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81.6¢/kg + 20%.
- 5102.19 Other (under: Fine animal hair).
- 5102.19.20.00 Hair of the camel (under: Not processed in any manner beyond the degreased or carbonized condition) (cy kg, kg): General 5¢/clean kg; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 55¢/clean kg.
- 5102.19.60 Other (under: Not processed in any manner beyond the degreased or carbonized condition): General 0.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.9%.
- 5102.19.60.30 Hair of the Angora goat (under: Other) (cy kg, kg).
- 5102.19.60.60 Other (under: Other) (cy kg, kg).
- 5102.19.80.00 Fur, prepared for hatters' use (kg): General Free; Special none; Column 2 35%.
- 5102.19.90.00 Other (under: Other) (kg): General 4.9¢/kg + 4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81.6¢/kg + 20%.
- 5102.20.00.00 Coarse animal hair (under: Fine or coarse animal hair, not carded or combed) (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.