HTS Heading 5107
Yarn of combed wool, not put up for retail sale
All 4 HTS codes under heading 5107 (yarn of combed wool, not put up for retail sale), with their duty rates from the 2026 HTS Revision 23. General duty 6%.
Every line of heading 5107
- 5107 Yarn of combed wool, not put up for retail sale.
- 5107.10 Containing 85 percent or more by weight of wool.
- 5107.10.30.00 Of wool fiber with an average fiber diameter of 18.5 microns or less (400) (kg): General 6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55.5%.
- 5107.10.60.00 Other (400) (under: Containing 85 percent or more by weight of wool) (kg): General 6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55.5%.
- 5107.20 Containing less than 85 percent by weight of wool.
- 5107.20.30.00 Of wool fiber with an average fiber diameter of 18.5 microns or less (400) (kg): General 6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55.5%.
- 5107.20.60.00 Other (400) (under: Containing less than 85 percent by weight of wool) (kg): General 6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.