HTS Heading 5108

Yarn of fine animal hair (carded or combed), not put up for retail sale

All 6 HTS codes under heading 5108 (yarn of fine animal hair (carded or combed)), with their duty rates from the 2026 HTS Revision 23. General duty 4%.

Every line of heading 5108

  • 5108 Yarn of fine animal hair (carded or combed), not put up for retail sale.
  • 5108.10 Carded (under: Yarn of fine animal hair (carded or combed), not put up for retail sale).
  • 5108.10.30.00 Of Angora rabbit hair (400) (under: Carded) (kg): General 4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55.5%.
  • 5108.10.40.00 Of mohair (400) (under: Carded) (kg): General 4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55.5%.
  • 5108.10.80.00 Other (400) (under: Carded) (kg): General 4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55.5%.
  • 5108.20 Combed (under: Yarn of fine animal hair (carded or combed), not put up for retail sale).
  • 5108.20.30.00 Of Angora rabbit hair (400) (under: Combed) (kg): General 4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55.5%.
  • 5108.20.40.00 Of mohair (400) (under: Combed) (kg): General 4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55.5%.
  • 5108.20.80.00 Other (400) (under: Combed) (kg): General 4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.