HTS Heading 5109
Yarn of wool or of fine animal hair, put up for retail sale
All 8 HTS codes under heading 5109 (yarn of wool or of fine animal hair), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6%.
Every line of heading 5109
- 5109 Yarn of wool or of fine animal hair, put up for retail sale.
- 5109.10 Containing 85 percent or more by weight of wool or of fine animal hair.
- 5109.10.20.00 Yarn of wool, colored (dyed or printed) and cut into uniform lengths of not over 8 cm (400) (kg): General Free; Special none; Column 2 Free.
- 5109.10.40.00 Of Angora rabbit hair (400) (under: Other) (kg): General 4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 55.5%.
- 5109.10.80.00 Of wool fiber with an average fiber diameter of 18.5 microns or less (400) (kg): General 6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 55.5%.
- 5109.10.90.00 Other (400) (under: Other) (kg): General 6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 55.5%.
- 5109.90 Other (under: Yarn of wool or of fine animal hair, put up for retail sale).
- 5109.90.20.00 Yarn of wool, colored (dyed or printed) and cut into uniform lengths of not over 8 cm (400) (kg): General Free; Special none; Column 2 Free.
- 5109.90.40.00 Of Angora rabbit hair (400) (under: Other) (kg): General 4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 55.5%.
- 5109.90.80.00 Of wool fiber with an average fiber diameter of 18.5 microns or less (400) (kg): General 6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 55.5%.
- 5109.90.90.00 Other (400) (under: Other) (kg): General 6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 55.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.