HTS Heading 5201

Cotton, not carded or combed

All 12 HTS codes under heading 5201 (cotton, not carded or combed), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 5201

  • 5201.00 Cotton, not carded or combed.
  • 5201.00.05.00 Harsh or rough, having a staple length under 19.05 mm (3/4 inch) (kg): General Free; Special none; Column 2 Free.
  • 5201.00.12.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General Free; Special none; Column 2 Free.
  • 5201.00.14.00 Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions (kg): General Free; Special none; Column 2 Free.
  • 5201.00.18.00 Other (under: Other) (kg): General 31.4¢/kg; Special Free (A+,AU,BH,CL,CO,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 36.9¢/kg.
  • 5201.00.22.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General 4.4¢/kg; Special Free (A+,AU,BH,CL,CO,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 15.4¢/kg.
  • 5201.00.24.00 Described in additional U.S. note 6 to this chapter and entered pursuant to its provisions (kg): General 4.4¢/kg; Special Free (A+,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg.
  • 5201.00.28.00 Other (under: Other, harsh or rough, having a staple length of 29.36875 mm (1-5/32 inches) or more and white in color (except cotton of perished staple, grabbots and cotton pickings)) (kg): General 31.4¢/kg; Special Free (A+,AU,BH,CL,CO,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 36.9¢/kg.
  • 5201.00.34.00 Described in additional U.S. note 7 to this chapter and entered pursuant to its provisions (kg): General 4.4¢/kg; Special Free (A+,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg.
  • 5201.00.38.00 Other (under: Other) (kg): General 31.4¢/kg; Special Free (A+,AU,BH,CL,CO,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 36.9¢/kg.
  • 5201.00.55.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General 1.5¢/kg; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 15.4¢/kg.
  • 5201.00.60.00 Described in additional U.S. note 8 to this chapter and entered pursuant to its provisions (kg): General 1.5¢/kg; Special Free (BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg.
  • 5201.00.80.00 Other (under: Having a staple length of 34.925 mm (1-3/8 inches) or more) (kg): General 31.4¢/kg; Special Free (AU,BH,CL,CO,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 36.9¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.