HTS Heading 5202
Cotton waste (including yarn waste and garnetted stock)
All 6 HTS codes under heading 5202 (cotton waste), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.3%, some per unit.
Every line of heading 5202
- 5202 Cotton waste (including yarn waste and garnetted stock).
- 5202.10.00.00 Yarn waste (including thread waste) (kg): General Free; Special none; Column 2 Free.
- 5202.91.00.00 Garnetted stock (under: Other) (kg): General 4.3%; Special Free (A+,AU,BH,CL,CO,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 5%.
- 5202.99 Other (under: Other).
- 5202.99.05.00 Described in general note 15 of the tariff schedule and entered pursuant to its provisions (kg): General Free; Special none; Column 2 Free.
- 5202.99.10.00 Described in additional U.S. note 9 to this chapter and entered pursuant to its provisions (kg): General Free; Special none; Column 2 Free.
- 5202.99.30.00 Other (under: Card strips made from cotton having a staple length under 30.1625 mm (1-3/16 inches) and lap waste, sliver waste and roving waste) (kg): General 7.8¢/kg; Special Free (A+,AU,BH,CL,CO,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9.2¢/kg.
- 5202.99.50.00 Other (under: Other) (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.