HTS Heading 5205

Cotton yarn (other than sewing thread), containing 85 percent or more by weight of cotton, not put up for retail sale

All 48 HTS codes under heading 5205 (cotton yarn (other than sewing thread)), with their duty rates from the 2026 HTS Revision 23. General duty 3.7% to 12%.

Every line of heading 5205

  • 5205 Cotton yarn (other than sewing thread), containing 85 percent or more by weight of cotton, not put up for retail sale.
  • 5205.11 Not exceeding 14 nm (under: Single yarn, of uncombed fibers).
  • 5205.11.10.00 Unbleached, not mercerized (300) (kg): General 3.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 6.9%.
  • 5205.11.20.00 Other (300) (under: Not exceeding 14 nm) (kg): General 5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 11.9%.
  • 5205.12 Exceeding 14 nm but not exceeding 43 nm.
  • 5205.12.10.00 Unbleached, not mercerized (300) (kg): General 5.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 10.3%.
  • 5205.12.20.00 Other (300) (under: Exceeding 14 nm but not exceeding 43 nm) (kg): General 6.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 15.3%.
  • 5205.13 Exceeding 43 nm but not exceeding 52 nm.
  • 5205.13.10.00 Unbleached, not mercerized (300) (kg): General 6.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 13.9%.
  • 5205.13.20.00 Other (300) (under: Exceeding 43 nm but not exceeding 52 nm) (kg): General 7.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 18.9%.
  • 5205.14 Exceeding 52 nm but not exceeding 80 nm.
  • 5205.14.10.00 Unbleached, not mercerized (300) (kg): General 7.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 17.3%.
  • 5205.14.20.00 Other (300) (under: Exceeding 52 nm but not exceeding 80 nm) (kg): General 8.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 22.3%.
  • 5205.15 Exceeding 80 nm (under: Single yarn, of uncombed fibers).
  • 5205.15.10.00 Unbleached, not mercerized (300) (kg): General 9.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 29.1%.
  • 5205.15.20.00 Other (300) (under: Exceeding 80 nm) (kg): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 34.1%.
  • 5205.21.00 Not exceeding 14 nm (under: Single yarn, of combed fibers): General 5.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11.9%.
  • 5205.21.00.20 Ring spun (301) (under: Not exceeding 14 nm) (kg).
  • 5205.21.00.90 Other (301) (under: Not exceeding 14 nm) (kg).
  • 5205.22.00 Exceeding 14 nm but not exceeding 43 nm: General 7.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.3%.
  • 5205.22.00.20 Ring spun (301) (under: Exceeding 14 nm but not exceeding 43 nm) (kg).
  • 5205.22.00.90 Other (301) (under: Exceeding 14 nm but not exceeding 43 nm) (kg).
  • 5205.23.00 Exceeding 43 nm but not exceeding 52 nm: General 8.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18.9%.
  • 5205.23.00.20 Ring spun (301) (under: Exceeding 43 nm but not exceeding 52 nm) (kg).
  • 5205.23.00.90 Other (301) (under: Exceeding 43 nm but not exceeding 52 nm) (kg).
  • 5205.24.00 Exceeding 52 nm but not exceeding 80 nm: General 9.9%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.3%.
  • 5205.24.00.20 Ring spun (301) (under: Exceeding 52 nm but not exceeding 80 nm) (kg).
  • 5205.24.00.90 Other (301) (under: Exceeding 52 nm but not exceeding 80 nm) (kg).
  • 5205.26.00 Measuring less than 125 decitex but not less than 106.38 decitex (exceeding 80 metric number but not exceeding 94 metric number): General 12%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 34.1%.
  • 5205.26.00.20 Ring spun (301) (under: Measuring less than 125 decitex but not less than 106.38 decitex (exceeding 80 metric number but not exceeding 94 metric number)) (kg).
  • 5205.26.00.90 Other (301) (under: Measuring less than 125 decitex but not less than 106.38 decitex (exceeding 80 metric number but not exceeding 94 metric number)) (kg).
  • 5205.27.00 Measuring less than 106.38 decitex but not less than 83.33 decitex (exceeding 94 metric number but not exceeding 120 metric number): General 12%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 34.1%.
  • 5205.27.00.20 Ring spun (301) (under: Measuring less than 106.38 decitex but not less than 83.33 decitex (exceeding 94 metric number but not exceeding 120 metric number)) (kg).
  • 5205.27.00.90 Other (301) (under: Measuring less than 106.38 decitex but not less than 83.33 decitex (exceeding 94 metric number but not exceeding 120 metric number)) (kg).
  • 5205.28.00 Measuring less than 83.33 decitex (exceeding 120 metric number): General 12%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 34.1%.
  • 5205.28.00.20 Ring spun (301) (under: Measuring less than 83.33 decitex (exceeding 120 metric number)) (kg).
  • 5205.28.00.90 Other (301) (under: Measuring less than 83.33 decitex (exceeding 120 metric number)) (kg).
  • 5205.31.00.00 Not exceeding 14 nm per single yarn (300) (kg): General 5.8%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 11.9%.
  • 5205.32.00.00 Exceeding 14 nm but not exceeding 43 nm per single yarn (300) (kg): General 7.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 15.3%.
  • 5205.33.00.00 Exceeding 43 nm but not exceeding 52 nm per single yarn (300) (kg): General 8.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 18.9%.
  • 5205.34.00.00 Exceeding 52 nm but not exceeding 80 nm per single yarn (300) (kg): General 9.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 22.3%.
  • 5205.35.00.00 Exceeding 80 nm per single yarn (300) (kg): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 34.1%.
  • 5205.41.00 Not exceeding 14 nm per single yarn: General 5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11.9%.
  • 5205.41.00.20 Ring spun (301) (under: Not exceeding 14 nm per single yarn) (kg).
  • 5205.41.00.90 Other (301) (under: Not exceeding 14 nm per single yarn) (kg).
  • 5205.42.00 Exceeding 14 nm but not exceeding 43 nm per single yarn: General 6.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.3%.
  • 5205.42.00.21 Compact, exceeding 41 nm (301) (kg).
  • 5205.42.00.29 Other (301) (under: Ring spun) (kg).
  • 5205.42.00.90 Other (301) (under: Exceeding 14 nm but not exceeding 43 nm per single yarn) (kg).
  • 5205.43.00 Exceeding 43 nm but not exceeding 52 nm per single yarn: General 8.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18.9%.
  • 5205.43.00.21 Compact (301) (under: Ring spun) (kg).
  • 5205.43.00.29 Other (301) (under: Ring spun) (kg).
  • 5205.43.00.90 Other (301) (under: Exceeding 43 nm but not exceeding 52 nm per single yarn) (kg).
  • 5205.44.00 Exceeding 52 nm but not exceeding 80 nm per single yarn: General 9.9%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.3%.
  • 5205.44.00.21 Compact (301) (under: Ring spun) (kg).
  • 5205.44.00.29 Other (301) (under: Ring spun) (kg).
  • 5205.44.00.90 Other (301) (under: Exceeding 52 nm but not exceeding 80 nm per single yarn) (kg).
  • 5205.46.00 Measuring per single yarn less than 125 decitex but not less than 106.38 decitex (exceeding 80 metric number but not exceeding 94 metric number): General 12%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 34.1%.
  • 5205.46.00.21 Compact (301) (under: Ring spun) (kg).
  • 5205.46.00.29 Other (301) (under: Ring spun) (kg).
  • 5205.46.00.90 Other (301) (under: Measuring per single yarn less than 125 decitex but not less than 106.38 decitex (exceeding 80 metric number but not exceeding 94 metric number)) (kg).
  • 5205.47.00 Measuring per single yarn less than 106.38 decitex but not less than 83.33 decitex (exceeding 94 metric number but not exceeding 120 metric number): General 12%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 34.1%.
  • 5205.47.00.21 Compact, not exceeding 102 nm (301) (kg).
  • 5205.47.00.29 Other (301) (under: Ring spun) (kg).
  • 5205.47.00.90 Other (301) (under: Measuring per single yarn less than 106.38 decitex but not less than 83.33 decitex (exceeding 94 metric number but not exceeding 120 metric number)) (kg).
  • 5205.48.00 Measuring per single yarn less than 83.33 decitex (exceeding 120 metric number): General 12%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 34.1%.
  • 5205.48.00.20 Ring spun (301) (under: Measuring per single yarn less than 83.33 decitex (exceeding 120 metric number)) (kg).
  • 5205.48.00.90 Other (301) (under: Measuring per single yarn less than 83.33 decitex (exceeding 120 metric number)) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.