HTS Heading 5204

Cotton sewing thread, whether or not put up for retail sale

All 3 HTS codes under heading 5204 (cotton sewing thread), with their duty rates from the 2026 HTS Revision 23. General duty 4.4%.

Every line of heading 5204

  • 5204 Cotton sewing thread, whether or not put up for retail sale.
  • 5204.11.00.00 Containing 85 percent or more by weight of cotton (200) (kg): General 4.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 25.5%.
  • 5204.19.00.00 Other (200) (under: Not put up for retail sale) (kg): General 4.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 25.5%.
  • 5204.20.00.00 Put up for retail sale (200) (under: Cotton sewing thread, whether or not put up for retail sale) (kg): General 4.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 25.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.