HTS Heading 5207

Cotton yarn (other than sewing thread) put up for retail sale

All 2 HTS codes under heading 5207 (cotton yarn), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5%.

Every line of heading 5207

  • 5207 Cotton yarn (other than sewing thread) put up for retail sale.
  • 5207.10.00.00 Containing 85 percent or more by weight of cotton (200) (kg): General Free; Special none; Column 2 25.5%.
  • 5207.90.00.00 Other (200) (under: Cotton yarn (other than sewing thread) put up for retail sale) (kg): General 5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 25.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.