HTS Heading 5208

Woven fabrics of cotton, containing 85 percent or more by weight of cotton, weighing not more than 200 g/m²

All 137 HTS codes under heading 5208 (woven fabrics of cotton), with their duty rates from the 2026 HTS Revision 23. General duty Free to 14.7%.

Every line of heading 5208

  • 5208 Woven fabrics of cotton, containing 85 percent or more by weight of cotton, weighing not more than 200 g/m².
  • 5208.11 Plain weave, weighing not more than 100 g/m².
  • 5208.11.20 Of number 42 or lower number (under: Plain weave, weighing not more than 100 g/m²): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 16.9%.
  • 5208.11.20.20 Poplin or broadcloth (314) (under: Of number 42 or lower number) (m², kg).
  • 5208.11.20.40 Sheeting (313) (under: Of number 42 or lower number) (m², kg).
  • 5208.11.20.90 Cheesecloth (226) (under: Of number 42 or lower number) (m², kg).
  • 5208.11.40 Of numbers 43 to 68 (under: Plain weave, weighing not more than 100 g/m²): General 9%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 21.7%.
  • 5208.11.40.20 Poplin or broadcloth (314) (under: Of numbers 43 to 68) (m², kg).
  • 5208.11.40.40 Sheeting (313) (under: Of numbers 43 to 68) (m², kg).
  • 5208.11.40.60 Printcloth (315) (under: Of numbers 43 to 68) (m², kg).
  • 5208.11.40.90 Cheesecloth (226) (under: Of numbers 43 to 68) (m², kg).
  • 5208.11.60.00 Suitable for making typewriter ribbon, containing yarns the average number of which exceeds 85 but not 237, the total thread count (treating multiple (folded) or cabled yarns as single threads) per square centimeter is not less than 94 and not more than 134, and in which the thread count of either the warp or filling does not exceed 60 percent of the total thread count of the warp and filling (220) (m², kg): General Free; Special none; Column 2 22¢/kg + 41.5%.
  • 5208.11.80 Other (under: Of number 69 or higher number): General 10.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 32.5%.
  • 5208.11.80.20 Poplin or broadcloth (314) (under: Other) (m², kg).
  • 5208.11.80.90 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
  • 5208.12 Plain weave, weighing more than 100 g/m².
  • 5208.12.40 Of number 42 or lower number (under: Plain weave, weighing more than 100 g/m²): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 16.9%.
  • 5208.12.40.20 Poplin or broadcloth (314) (under: Of number 42 or lower number) (m², kg).
  • 5208.12.40.40 Sheeting (313) (under: Of number 42 or lower number) (m², kg).
  • 5208.12.40.90 Cheesecloth (226) (under: Of number 42 or lower number) (m², kg).
  • 5208.12.60 Of numbers 43 to 68 (under: Plain weave, weighing more than 100 g/m²): General 9%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 21.7%.
  • 5208.12.60.20 Poplin or broadcloth (314) (under: Of numbers 43 to 68) (m², kg).
  • 5208.12.60.40 Sheeting (313) (under: Of numbers 43 to 68) (m², kg).
  • 5208.12.60.60 Printcloth (315) (under: Of numbers 43 to 68) (m², kg).
  • 5208.12.60.90 Cheesecloth (226) (under: Of numbers 43 to 68) (m², kg).
  • 5208.12.80 Of number 69 or higher number: General 10.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 32.5%.
  • 5208.12.80.20 Poplin or broadcloth (314) (under: Of number 69 or higher number) (m², kg).
  • 5208.12.80.90 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
  • 5208.13.00.00 3-thread or 4-thread twill, including cross twill (317) (m², kg): General 7.9%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18.7%.
  • 5208.19 Other fabrics (under: Unbleached).
  • 5208.19.20 Satin weave or twill weave (under: Other fabrics): General 7.9%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 18.7%.
  • 5208.19.20.20 Sateens (326) (under: Satin weave or twill weave) (m², kg).
  • 5208.19.20.90 Other (317) (under: Satin weave or twill weave) (m², kg).
  • 5208.19.40 Of number 42 or lower number (under: Other): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 16.9%.
  • 5208.19.40.20 Oxford cloth (227) (under: Of number 42 or lower number) (m², kg).
  • 5208.19.40.90 Other (220) (under: Of number 42 or lower number) (m², kg).
  • 5208.19.60 Of numbers 43 to 68 (under: Other): General 9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 21.7%.
  • 5208.19.60.20 Oxford cloth (227) (under: Of numbers 43 to 68) (m², kg).
  • 5208.19.60.90 Other (220) (under: Of numbers 43 to 68) (m², kg).
  • 5208.19.80 Of number 69 or higher number: General 10.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 32.5%.
  • 5208.19.80.20 Oxford cloth (227) (under: Of number 69 or higher number) (m², kg).
  • 5208.19.80.90 Other (220) (under: Of number 69 or higher number) (m², kg).
  • 5208.21 Plain weave, weighing not more than 100 g/m².
  • 5208.21.20 Of number 42 or lower number (under: Plain weave, weighing not more than 100 g/m²): General 8.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 19.9%.
  • 5208.21.20.20 Poplin or broadcloth (314) (under: Of number 42 or lower number) (m², kg).
  • 5208.21.20.40 Sheeting (313) (under: Of number 42 or lower number) (m², kg).
  • 5208.21.20.90 Cheesecloth (226) (under: Of number 42 or lower number) (m², kg).
  • 5208.21.40 Of numbers 43 to 68 (under: Plain weave, weighing not more than 100 g/m²): General 10.2%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 24.7%.
  • 5208.21.40.20 Poplin or broadcloth (314) (under: Of numbers 43 to 68) (m², kg).
  • 5208.21.40.40 Sheeting (313) (under: Of numbers 43 to 68) (m², kg).
  • 5208.21.40.60 Printcloth (315) (under: Of numbers 43 to 68) (m², kg).
  • 5208.21.40.90 Cheesecloth (226) (under: Of numbers 43 to 68) (m², kg).
  • 5208.21.60 Of number 69 or higher number: General 11.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35.5%.
  • 5208.21.60.20 Poplin or broadcloth (314) (under: Of number 69 or higher number) (m², kg).
  • 5208.21.60.90 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
  • 5208.22 Plain weave, weighing more than 100 g/m².
  • 5208.22.40 Of number 42 or lower number (under: Plain weave, weighing more than 100 g/m²): General 8.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 19.9%.
  • 5208.22.40.20 Poplin or broadcloth (314) (under: Of number 42 or lower number) (m², kg).
  • 5208.22.40.40 Sheeting (313) (under: Of number 42 or lower number) (m², kg).
  • 5208.22.40.90 Cheesecloth (226) (under: Of number 42 or lower number) (m², kg).
  • 5208.22.60 Of numbers 43 to 68 (under: Plain weave, weighing more than 100 g/m²): General 8.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 24.7%.
  • 5208.22.60.20 Poplin or broadcloth (314) (under: Of numbers 43 to 68) (m², kg).
  • 5208.22.60.40 Sheeting (313) (under: Of numbers 43 to 68) (m², kg).
  • 5208.22.60.60 Printcloth (315) (under: Of numbers 43 to 68) (m², kg).
  • 5208.22.60.90 Cheesecloth (226) (under: Of numbers 43 to 68) (m², kg).
  • 5208.22.80 Of number 69 or higher number: General 11.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35.5%.
  • 5208.22.80.20 Poplin or broadcloth (314) (under: Of number 69 or higher number) (m², kg).
  • 5208.22.80.90 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
  • 5208.23.00.00 3-thread or 4-thread twill, including cross twill (317) (m², kg): General 9.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 21.7%.
  • 5208.29 Other fabrics (under: Bleached).
  • 5208.29.20 Satin weave or twill weave (under: Other fabrics): General 7.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 21.7%.
  • 5208.29.20.20 Sateens (326) (under: Satin weave or twill weave) (m², kg).
  • 5208.29.20.90 Other (317) (under: Satin weave or twill weave) (m², kg).
  • 5208.29.40 Of number 42 or lower number (under: Other): General 8.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 19.9%.
  • 5208.29.40.20 Oxford cloth (227) (under: Of number 42 or lower number) (m², kg).
  • 5208.29.40.90 Other (220) (under: Of number 42 or lower number) (m², kg).
  • 5208.29.60 Of numbers 43 to 68 (under: Other): General 10.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 24.7%.
  • 5208.29.60.20 Oxford cloth (227) (under: Of numbers 43 to 68) (m², kg).
  • 5208.29.60.90 Other (220) (under: Of numbers 43 to 68) (m², kg).
  • 5208.29.80 Of number 69 or higher number: General 13.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 35.5%.
  • 5208.29.80.20 Oxford cloth (227) (under: Of number 69 or higher number) (m², kg).
  • 5208.29.80.90 Other (220) (under: Of number 69 or higher number) (m², kg).
  • 5208.31 Plain weave, weighing not more than 100 g/m².
  • 5208.31.20.00 Certified hand-loomed fabrics (m², kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.31.40 Of number 42 or lower number (under: Other): General 8.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.9%.
  • 5208.31.40.20 Poplin or broadcloth (314) (under: Of number 42 or lower number) (m², kg).
  • 5208.31.40.40 Sheeting (313) (under: Of number 42 or lower number) (m², kg).
  • 5208.31.40.90 Cheesecloth (226) (under: Of number 42 or lower number) (m², kg).
  • 5208.31.60 Of numbers 43 to 68 (under: Other): General 9.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 27.7%.
  • 5208.31.60.20 Poplin or broadcloth (314) (under: Of numbers 43 to 68) (m², kg).
  • 5208.31.60.40 Sheeting (313) (under: Of numbers 43 to 68) (m², kg).
  • 5208.31.60.60 Printcloth (315) (under: Of numbers 43 to 68) (m², kg).
  • 5208.31.60.90 Cheesecloth (226) (under: Of numbers 43 to 68) (m², kg).
  • 5208.31.80 Of number 69 or higher number: General 12.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.31.80.20 Poplin or broadcloth (314) (under: Of number 69 or higher number) (m², kg).
  • 5208.31.80.90 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
  • 5208.32 Plain weave, weighing more than 100 g/m².
  • 5208.32.10.00 Certified hand-loomed fabrics (m², kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.32.30 Of number 42 or lower number (under: Other): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.9%.
  • 5208.32.30.20 Poplin or broadcloth (314) (under: Of number 42 or lower number) (m², kg).
  • 5208.32.30.40 Sheeting (313) (under: Of number 42 or lower number) (m², kg).
  • 5208.32.30.90 Cheesecloth (226) (under: Of number 42 or lower number) (m², kg).
  • 5208.32.40 Of numbers 43 to 68 (under: Other): General 9.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 27.7%.
  • 5208.32.40.20 Poplin or broadcloth (314) (under: Of numbers 43 to 68) (m², kg).
  • 5208.32.40.40 Sheeting (313) (under: Of numbers 43 to 68) (m², kg).
  • 5208.32.40.60 Printcloth (315) (under: Of numbers 43 to 68) (m², kg).
  • 5208.32.40.90 Cheesecloth (226) (under: Of numbers 43 to 68) (m², kg).
  • 5208.32.50 Of number 69 or higher number: General 12.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.32.50.20 Poplin or broadcloth (314) (under: Of number 69 or higher number) (m², kg).
  • 5208.32.50.90 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
  • 5208.33.00.00 3-thread or 4-thread twill, including cross twill (317) (m², kg): General 10.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 24.7%.
  • 5208.39 Other fabrics (under: Dyed).
  • 5208.39.20 Satin weave or twill weave (under: Other fabrics): General 8.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 24.7%.
  • 5208.39.20.20 Sateens (326) (under: Satin weave or twill weave) (m², kg).
  • 5208.39.20.90 Other (317) (under: Satin weave or twill weave) (m², kg).
  • 5208.39.40 Of number 42 or lower number (under: Other): General 7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 22.9%.
  • 5208.39.40.20 Oxford cloth (227) (under: Of number 42 or lower number) (m², kg).
  • 5208.39.40.90 Other (220) (under: Of number 42 or lower number) (m², kg).
  • 5208.39.60 Of numbers 43 to 68 (under: Other): General 9.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 27.7%.
  • 5208.39.60.20 Oxford cloth (227) (under: Of numbers 43 to 68) (m², kg).
  • 5208.39.60.90 Other (220) (under: Of numbers 43 to 68) (m², kg).
  • 5208.39.80 Of number 69 or higher number: General 12.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.39.80.20 Oxford cloth (227) (under: Of number 69 or higher number) (m², kg).
  • 5208.39.80.90 Other (220) (under: Of number 69 or higher number) (m², kg).
  • 5208.41 Plain weave, weighing not more than 100 g/m².
  • 5208.41.20.00 Certified hand-loomed fabrics (m², kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.41.40.00 Of number 42 or lower number (218) (m², kg): General 8.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 22.9%.
  • 5208.41.60.00 Of numbers 43 to 68 (218) (under: Other) (m², kg): General 11.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 27.7%.
  • 5208.41.80.00 Of number 69 or higher number (218) (m², kg): General 14.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.42 Plain weave, weighing more than 100 g/m².
  • 5208.42.10.00 Certified hand-loomed fabrics (m², kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.42.30.00 Of number 42 or lower number (218) (m², kg): General 8.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 22.9%.
  • 5208.42.40.00 Of numbers 43 to 68 (218) (under: Other) (m², kg): General 11.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 27.7%.
  • 5208.42.50.00 Of number 69 or higher number (218) (m², kg): General 14.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.43.00.00 3-thread or 4-thread twill, including cross twill (218) (m², kg): General Free; Special none; Column 2 24.7%.
  • 5208.49 Other fabrics (under: Of yarns of different colors).
  • 5208.49.20.00 Satin weave or twill weave (218) (m², kg): General Free; Special none; Column 2 24.7%.
  • 5208.49.40 Of number 42 or lower number (under: Other): General 8.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 22.9%.
  • 5208.49.40.10 Oxford cloth (218) (under: Of number 42 or lower number) (m², kg).
  • 5208.49.40.20 Jacquard woven (220) (under: Of number 42 or lower number) (m², kg).
  • 5208.49.40.90 Other (218) (under: Of number 42 or lower number) (m², kg).
  • 5208.49.60 Of numbers 43 to 68 (under: Other): General 9.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 27.7%.
  • 5208.49.60.10 Oxford cloth (218) (under: Of numbers 43 to 68) (m², kg).
  • 5208.49.60.20 Of a width exceeding 127 cm (220) (m², kg).
  • 5208.49.60.30 Other (220) (under: Jacquard woven) (m², kg).
  • 5208.49.60.90 Other (218) (under: Of numbers 43 to 68) (m², kg).
  • 5208.49.80 Of number 69 or higher number: General 14.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.49.80.20 Jacquard woven (220) (under: Of number 69 or higher number) (m², kg).
  • 5208.49.80.90 Other (218) (under: Of number 69 or higher number) (m², kg).
  • 5208.51 Plain weave, weighing not more than 100 g/m².
  • 5208.51.20.00 Certified hand-loomed fabrics (m², kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.51.40 Of number 42 or lower number (under: Other): General 8.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.9%.
  • 5208.51.40.20 Poplin or broadcloth (314) (under: Of number 42 or lower number) (m², kg).
  • 5208.51.40.40 Sheeting (313) (under: Of number 42 or lower number) (m², kg).
  • 5208.51.40.90 Cheesecloth (226) (under: Of number 42 or lower number) (m², kg).
  • 5208.51.60 Of numbers 43 to 68 (under: Other): General 11.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 27.7%.
  • 5208.51.60.20 Poplin or broadcloth (314) (under: Of numbers 43 to 68) (m², kg).
  • 5208.51.60.40 Sheeting (313) (under: Of numbers 43 to 68) (m², kg).
  • 5208.51.60.60 Printcloth (315) (under: Of numbers 43 to 68) (m², kg).
  • 5208.51.60.90 Cheesecloth (226) (under: Of numbers 43 to 68) (m², kg).
  • 5208.51.80 Of number 69 or higher number: General 12.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.51.80.20 Poplin or broadcloth (314) (under: Of number 69 or higher number) (m², kg).
  • 5208.51.80.90 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
  • 5208.52 Plain weave, weighing more than 100 g/m².
  • 5208.52.10.00 Certified hand-loomed fabrics (m², kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.52.30 Of number 42 or lower number (under: Other): General 6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.9%.
  • 5208.52.30.20 Poplin or broadcloth (314) (under: Of number 42 or lower number) (m², kg).
  • 5208.52.30.35 Discharge printed (313) (under: Sheeting) (m², kg).
  • 5208.52.30.45 Other (313) (under: Sheeting) (m², kg).
  • 5208.52.30.90 Cheesecloth (226) (under: Of number 42 or lower number) (m², kg).
  • 5208.52.40 Of numbers 43 to 68 (under: Other): General 11.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 27.7%.
  • 5208.52.40.20 Poplin or broadcloth (314) (under: Of numbers 43 to 68) (m², kg).
  • 5208.52.40.35 Discharge printed (313) (under: Sheeting) (m², kg).
  • 5208.52.40.45 Other (313) (under: Sheeting) (m², kg).
  • 5208.52.40.55 Discharge printed (315) (under: Printcloth) (m², kg).
  • 5208.52.40.65 Other (315) (under: Printcloth) (m², kg).
  • 5208.52.40.90 Cheesecloth (226) (under: Of numbers 43 to 68) (m², kg).
  • 5208.52.50 Of number 69 or higher number: General 12.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.52.50.20 Poplin or broadcloth (314) (under: Of number 69 or higher number) (m², kg).
  • 5208.52.50.90 Cheesecloth; lawns,voiles or batistes (226) (m², kg).
  • 5208.59 Other fabrics (under: Printed).
  • 5208.59.10.00 3-thread or 4-thread twill, including cross twill (317) (m², kg): General 8.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 24.7%.
  • 5208.59.20 Satin weave or twill weave, other than 3-thread or 4-thread twill or cross twill: General 10.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 24.7%.
  • 5208.59.20.15 Discharge printed (326) (under: Sateens) (m², kg).
  • 5208.59.20.25 Other (326) (under: Sateens) (m², kg).
  • 5208.59.20.85 Discharge printed (317) (under: Other) (m², kg).
  • 5208.59.20.95 Other (317) (under: Other) (m², kg).
  • 5208.59.40 Of number 42 or lower number (under: Other): General 6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.9%.
  • 5208.59.40.20 Oxford cloth (227) (under: Of number 42 or lower number) (m², kg).
  • 5208.59.40.90 Other (220) (under: Of number 42 or lower number) (m², kg).
  • 5208.59.60 Of numbers 43 to 68 (under: Other): General 9.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 27.7%.
  • 5208.59.60.20 Oxford cloth (227) (under: Of numbers 43 to 68) (m², kg).
  • 5208.59.60.90 Other (220) (under: Of numbers 43 to 68) (m², kg).
  • 5208.59.80 Of number 69 or higher number: General 11.4%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38.5%.
  • 5208.59.80.20 Oxford cloth (227) (under: Of number 69 or higher number) (m², kg).
  • 5208.59.80.90 Other (220) (under: Of number 69 or higher number) (m², kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.