HTS Heading 5301
Flax, raw or processed but not spun; flax tow and waste (including yarn waste and garnetted stock)
All 4 HTS codes under heading 5301 (flax), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.8%, some per unit.
Every line of heading 5301
- 5301 Flax, raw or processed but not spun; flax tow and waste (including yarn waste and garnetted stock).
- 5301.10.00.00 Flax, raw or retted (under: Flax, raw or processed but not spun; flax tow and waste (including yarn waste and garnetted stock)) (kg): General Free; Special none; Column 2 0.3¢/kg.
- 5301.21.00.00 Broken or scutched (under: Flax, broken, scutched, hackled or otherwise processed, but not spun) (kg): General 0.2¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.3¢/kg.
- 5301.29.00.00 Other (under: Flax, broken, scutched, hackled or otherwise processed, but not spun) (kg): General 3.8%; Special Free (AU,BH, CL,CO,E,IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 20%.
- 5301.30.00.00 Flax tow and waste (under: Flax, raw or processed but not spun; flax tow and waste (including yarn waste and garnetted stock)) (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.