HTS Heading 5212
Other woven fabrics of cotton
All 93 HTS codes under heading 5212 (other woven fabrics of cotton), with their duty rates from the 2026 HTS Revision 23. General duty Free to 16.5%.
Every line of heading 5212
- 5212 Other woven fabrics of cotton.
- 5212.11 Unbleached (under: Weighing not more than 200 g/m²).
- 5212.11.10 Containing 36 percent or more by weight of wool or fine animal hair: General 16.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
- 5212.11.10.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.11.10.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.11.60 Other (under: Unbleached): General 7.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 5212.11.60.10 Mixed mainly or solely with wool or fine animal hair (220) (m², kg).
- 5212.11.60.20 Poplin or broadcloth (314) (under: Other) (m², kg).
- 5212.11.60.30 Sheeting (313) (under: Other) (m², kg).
- 5212.11.60.40 Printcloth (315) (under: Other) (m², kg).
- 5212.11.60.50 Cheesecloth; lawns,voiles or batistes (226) (m², kg).
- 5212.11.60.60 Sateens (326) (under: Satin weave or twill weave) (m², kg).
- 5212.11.60.70 Other (317) (under: Satin weave or twill weave) (m², kg).
- 5212.11.60.80 Oxford cloth (227) (under: Other) (m², kg).
- 5212.11.60.90 Other (220) (under: Other) (m², kg).
- 5212.12 Bleached (under: Weighing not more than 200 g/m²).
- 5212.12.10 Containing 36 percent or more by weight of wool or fine animal hair: General 16.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
- 5212.12.10.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.12.10.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.12.60 Other (under: Bleached): General 7.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 5212.12.60.10 Mixed mainly or solely with wool or fine animal hair (220) (m², kg).
- 5212.12.60.20 Poplin or broadcloth (314) (under: Other) (m², kg).
- 5212.12.60.30 Sheeting (313) (under: Other) (m², kg).
- 5212.12.60.40 Printcloth (315) (under: Other) (m², kg).
- 5212.12.60.50 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
- 5212.12.60.60 Sateens (326) (under: Satin weave or twill weave) (m², kg).
- 5212.12.60.70 Other (317) (under: Satin weave or twill weave) (m², kg).
- 5212.12.60.80 Oxford cloth (227) (under: Other) (m², kg).
- 5212.12.60.90 Other (220) (under: Other) (m², kg).
- 5212.13 Dyed (under: Weighing not more than 200 g/m²).
- 5212.13.10 Containing 36 percent or more by weight of wool or fine animal hair: General 16.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
- 5212.13.10.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.13.10.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.13.60 Other (under: Dyed): General 7.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 5212.13.60.10 Mixed mainly or solely with wool or fine animal hair (220) (m², kg).
- 5212.13.60.20 Poplin or broadcloth (314) (under: Other) (m², kg).
- 5212.13.60.30 Sheeting (313) (under: Other) (m², kg).
- 5212.13.60.40 Printcloth (315) (under: Other) (m², kg).
- 5212.13.60.50 Cheesecloth; lawns, voiles or batistes (226) (m², kg).
- 5212.13.60.60 Sateens (326) (under: Satin weave or twill weave) (m², kg).
- 5212.13.60.70 Other (317) (under: Satin weave or twill weave) (m², kg).
- 5212.13.60.80 Oxford cloth (227) (under: Other) (m², kg).
- 5212.13.60.90 Other (220) (under: Other) (m², kg).
- 5212.14 Of yarns of different colors (under: Weighing not more than 200 g/m²).
- 5212.14.10 Containing 36 percent or more by weight of wool or fine animal hair: General 16.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
- 5212.14.10.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.14.10.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.14.60 Other (under: Of yarns of different colors): General 7.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 5212.14.60.10 Mixed mainly or solely with wool or fine animal hair (220) (m², kg).
- 5212.14.60.20 Of a width exceeding 127 cm (220) (m², kg).
- 5212.14.60.30 Other (220) (under: Jacquard woven) (m², kg).
- 5212.14.60.90 Other (218) (under: Other) (m², kg).
- 5212.15 Printed (under: Weighing not more than 200 g/m²).
- 5212.15.10 Containing 36 percent or more by weight of wool or fine animal hair: General Free; Special none; Column 2 68.5%.
- 5212.15.10.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.15.10.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.15.60 Other (under: Printed): General 7.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 5212.15.60.10 Mixed mainly or solely with wool or fine animal hair (220) (m², kg).
- 5212.15.60.20 Poplin or broadcloth (314) (under: Other) (m², kg).
- 5212.15.60.30 Sheeting (313) (under: Other) (m², kg).
- 5212.15.60.40 Printcloth (315) (under: Other) (m², kg).
- 5212.15.60.50 Cheesecloth; lawns,voiles or batistes (226) (m², kg).
- 5212.15.60.60 Sateens (326) (under: Satin weave or twill weave) (m², kg).
- 5212.15.60.70 Other (317) (under: Satin weave or twill weave) (m², kg).
- 5212.15.60.80 Oxford cloth (227) (under: Other) (m², kg).
- 5212.15.60.90 Other (220) (under: Other) (m², kg).
- 5212.21 Unbleached (under: Weighing more than 200 g/m²).
- 5212.21.10 Containing 36 percent or more by weight of wool or fine animal hair: General 16.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
- 5212.21.10.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.21.10.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.21.60 Other (under: Unbleached): General 7.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 5212.21.60.10 Mixed mainly or solely with wool or fine animal hair (220) (m², kg).
- 5212.21.60.20 Poplin or broadcloth (314) (under: Other) (m², kg).
- 5212.21.60.30 Sheeting (313) (under: Other) (m², kg).
- 5212.21.60.40 Duck (219) (under: Other) (m², kg).
- 5212.21.60.50 Sateens (326) (under: Satin weave or twill weave) (m², kg).
- 5212.21.60.60 Other (317) (under: Satin weave or twill weave) (m², kg).
- 5212.21.60.90 Other (220) (under: Other) (m², kg).
- 5212.22 Bleached (under: Weighing more than 200 g/m²).
- 5212.22.10 Containing 36 percent or more by weight of wool or fine animal hair: General 16.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5212.22.10.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.22.10.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.22.60 Other (under: Bleached): General 7.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 5212.22.60.10 Mixed mainly or solely with wool or fine animal hair (220) (m², kg).
- 5212.22.60.20 Poplin or broadcloth (314) (under: Other) (m², kg).
- 5212.22.60.30 Sheeting (313) (under: Other) (m², kg).
- 5212.22.60.40 Duck (219) (under: Other) (m², kg).
- 5212.22.60.50 Sateens (326) (under: Satin weave or twill weave) (m², kg).
- 5212.22.60.60 Other (317) (under: Satin weave or twill weave) (m², kg).
- 5212.22.60.90 Other (220) (under: Other) (m², kg).
- 5212.23 Dyed (under: Weighing more than 200 g/m²).
- 5212.23.10 Containing 36 percent or more by weight of wool or fine animal hair: General 16.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
- 5212.23.10.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.23.10.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.23.60 Other (under: Dyed): General 7.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 5212.23.60.10 Mixed mainly or solely with wool or fine animal hair (220) (m², kg).
- 5212.23.60.20 Poplin or broadcloth (314) (under: Other) (m², kg).
- 5212.23.60.30 Sheeting (313) (under: Other) (m², kg).
- 5212.23.60.40 Duck (219) (under: Other) (m², kg).
- 5212.23.60.50 Sateens (326) (under: Satin weave or twill weave) (m², kg).
- 5212.23.60.60 Other (317) (under: Satin weave or twill weave) (m², kg).
- 5212.23.60.90 Other (220) (under: Other) (m², kg).
- 5212.24 Of yarns of different colors (under: Weighing more than 200 g/m²).
- 5212.24.10 Containing 36 percent or more by weight of wool or fine animal hair: General 16.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
- 5212.24.10.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.24.10.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.24.60 Other (under: Of yarns of different colors): General 7.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 5212.24.60.10 Mixed mainly or solely with wool or fine animal hair (220) (m², kg).
- 5212.24.60.20 Blue denim (225) (under: Other) (m², kg).
- 5212.24.60.30 Of a width exceeding 127 cm (220) (m², kg).
- 5212.24.60.40 Other (220) (under: Jacquard woven) (m², kg).
- 5212.24.60.90 Other (218) (under: Other) (m², kg).
- 5212.25 Printed (under: Weighing more than 200 g/m²).
- 5212.25.10 Containing 36 percent or more by weight of wool or fine animal hair: General Free; Special none; Column 2 68.5%.
- 5212.25.10.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.25.10.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
- 5212.25.60 Other (under: Printed): General Free; Special none; Column 2 40%.
- 5212.25.60.10 Mixed mainly or solely with wool or fine animal hair (220) (m², kg).
- 5212.25.60.20 Poplin or broadcloth (314) (under: Other) (m², kg).
- 5212.25.60.30 Sheeting (313) (under: Other) (m², kg).
- 5212.25.60.40 Duck (219) (under: Other) (m², kg).
- 5212.25.60.50 Sateens (326) (under: Satin weave or twill weave) (m², kg).
- 5212.25.60.60 Other (317) (under: Satin weave or twill weave) (m², kg).
- 5212.25.60.90 Other (220) (under: Other) (m², kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.