HTS Heading 5307

Yarn of jute or of other textile bast fibers of heading 5303

All 2 HTS codes under heading 5307 (yarn of jute), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 5307

  • 5307 Yarn of jute or of other textile bast fibers of heading 5303.
  • 5307.10.00.00 Single (under: Yarn of jute or of other textile bast fibers of heading 5303) (kg): General Free; Special none; Column 2 15%.
  • 5307.20.00.00 Multiple (folded) or cabled (under: Yarn of jute or of other textile bast fibers of heading 5303) (kg): General Free; Special none; Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.