HTS Heading 5308

Yarn of other vegetable textile fibers; paper yarn

All 4 HTS codes under heading 5308 (yarn of other vegetable textile fibers), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.7%.

Every line of heading 5308

  • 5308 Yarn of other vegetable textile fibers; paper yarn.
  • 5308.10.00.00 Coir yarn (under: Yarn of other vegetable textile fibers; paper yarn) (kg): General Free; Special none; Column 2 Free.
  • 5308.20.00.00 True hemp yarn (800) (under: Yarn of other vegetable textile fibers; paper yarn) (kg): General Free; Special none; Column 2 35%.
  • 5308.90 Other (under: Yarn of other vegetable textile fibers; paper yarn).
  • 5308.90.10.00 Paper yarn (under: Other) (kg): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 5308.90.90.00 Other (800) (under: Other) (kg): General Free; Special none; Column 2 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.