HTS Heading 5406

Man-made filament yarn (other than sewing thread), put up for retail sale

All 4 HTS codes under heading 5406 (man-made filament yarn (other than sewing thread)), with their duty rates from the 2026 HTS Revision 23. General duty 7.5%.

Every line of heading 5406

  • 5406.00 Man-made filament yarn (other than sewing thread), put up for retail sale.
  • 5406.00.10 Synthetic filament yarn (under: Man-made filament yarn (other than sewing thread), put up for retail sale): General 7.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 5406.00.10.20 Of acrylic (200) (under: Synthetic filament yarn) (kg).
  • 5406.00.10.40 Of polyesters (200) (under: Synthetic filament yarn) (kg).
  • 5406.00.10.90 Other (200) (under: Synthetic filament yarn) (kg).
  • 5406.00.20.00 Artificial filament yarn (200) (kg): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.