HTS Chapter 54

Man-made filaments; strip and the like of man-made textile materials

The 8 headings and 265 HTS codes of chapter 54 (man-made filaments), with their duty rates from the 2026 HTS Revision 23.

The 8 headings of chapter 54

Where it sits in the schedule

Chapter 54 is in Section XI of the Harmonized System, textiles and apparel (chapters 50 to 63). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.

Last reviewed 2026-11-12.