HTS Heading 5501
Synthetic filament tow
All 7 HTS codes under heading 5501 (synthetic filament tow), with their duty rates from the 2026 HTS Revision 23. General duty 7.5%.
Every line of heading 5501
- 5501 Synthetic filament tow.
- 5501.11.00.00 Of aramids (under: Of nylon or other polyamides) (kg): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 45%.
- 5501.19.00.00 Other (under: Of nylon or other polyamides) (kg): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 45%.
- 5501.20.00.00 Of polyesters (under: Synthetic filament tow) (kg): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 45%.
- 5501.30.00 Acrylic or modacrylic (under: Synthetic filament tow): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 45%.
- 5501.30.00.10 Containing 92 percent or more by weight of acrylonitrile units with filaments numbering fewer than 70,000 (+/-2000) with filament diameter 1.59 decitex (plus or minus 0.027) or less, or in a separable tow construction capable of being separated into tows of 70,000 (+/-2000) or fewer with filament diameter 1.59 decitex (plus or minus 0.027) or less. (kg).
- 5501.30.00.90 Other (under: Acrylic or modacrylic) (kg).
- 5501.40.00.00 Of polypropylene (under: Synthetic filament tow) (kg): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 45%.
- 5501.90.01.00 Other (under: Synthetic filament tow) (kg): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.