HTS Heading 5408

Woven fabrics of artificial filament yarn, including woven fabrics obtained from materials of heading 5405

All 57 HTS codes under heading 5408 (woven fabrics), with their duty rates from the 2026 HTS Revision 23. General duty Free to 25%, some per unit.

Every line of heading 5408

  • 5408 Woven fabrics of artificial filament yarn, including woven fabrics obtained from materials of heading 5405.
  • 5408.10.00.00 Woven fabrics obtained from high tenacity yarn of viscose rayon (618) (m², kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5408.21.00 Unbleached or bleached (under: Other woven fabrics, containing 85 percent or more by weight of artificial filament or strip or the like): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5408.21.00.30 Weighing not more than 170 g/m² (618) (m², kg).
  • 5408.21.00.60 Weighing more than 170 g/m² (618) (m², kg).
  • 5408.22 Dyed (under: Other woven fabrics, containing 85 percent or more by weight of artificial filament or strip or the like).
  • 5408.22.10.00 Of cuprammonium rayon (618) (under: Dyed) (m², kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5408.22.90 Other (under: Dyed): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5408.22.90.30 Weighing not more than 170 g/m² (618) (m², kg).
  • 5408.22.90.60 Weighing more than 170 g/m² (618) (m², kg).
  • 5408.23 Of yarns of different colors (under: Other woven fabrics, containing 85 percent or more by weight of artificial filament or strip or the like).
  • 5408.23.11.00 Of cuprammonium rayon (618) (under: The thread count of which per cm (treating multiple (folded) or cabled yarns as single threads) is over 69 but not over 142 in the warp and over 31 but not over 71 in the filling) (m², kg): General Free; Special none; Column 2 24.3¢/kg + 81%.
  • 5408.23.19.00 Other (618) (under: The thread count of which per cm (treating multiple (folded) or cabled yarns as single threads) is over 69 but not over 142 in the warp and over 31 but not over 71 in the filling) (m², kg): General Free; Special none; Column 2 24.3¢/kg + 81%.
  • 5408.23.21.00 Of cuprammonium rayon (618) (under: Other) (m², kg): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5408.23.29 Other (under: Other): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5408.23.29.30 Weighing not more than 170 g/m² (618) (m², kg).
  • 5408.23.29.60 Weighing more than 170 g/m² (618) (m², kg).
  • 5408.24 Printed (under: Other woven fabrics, containing 85 percent or more by weight of artificial filament or strip or the like).
  • 5408.24.10.00 Of cuprammonium rayon (618) (under: Printed) (m², kg): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5408.24.90 Other (under: Printed): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5408.24.90.10 Discharge printed (618) (under: Weighing not more than 170 g/m²) (m², kg).
  • 5408.24.90.20 Other (618) (under: Weighing not more than 170 g/m²) (m², kg).
  • 5408.24.90.40 Discharge printed (618) (under: Weighing more than 170 g/m²) (m², kg).
  • 5408.24.90.50 Other (618) (under: Weighing more than 170 g/m²) (m², kg).
  • 5408.31 Unbleached or bleached (under: Other woven fabrics).
  • 5408.31.05 Containing 36 percent or more by weight of wool or fine animal hair: General 25%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 48.5¢/kg + 68.5%.
  • 5408.31.05.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
  • 5408.31.05.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
  • 5408.31.10.00 Other (624) (under: Mixed mainly or solely with wool or fine animal hair) (m², kg): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 80.5%.
  • 5408.31.20 Other (under: Unbleached or bleached): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5408.31.20.10 Mixed mainly or solely with synthetic filaments (618) (m², kg).
  • 5408.31.20.20 Poplin or broadcloth (625) (under: Other) (m², kg).
  • 5408.31.20.30 Sheeting (627) (under: Other) (m², kg).
  • 5408.31.20.40 Printcloth (626) (under: Other) (m², kg).
  • 5408.31.20.50 Satin weave or twill weave (628) (m², kg).
  • 5408.31.20.90 Other (629) (under: Other) (m², kg).
  • 5408.32 Dyed (under: Other woven fabrics).
  • 5408.32.05 Containing 36 percent or more by weight of wool or fine animal hair: General 19.7%; Special Free (AU,BH,CL, CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 48.5¢/kg + 68.5%.
  • 5408.32.05.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
  • 5408.32.05.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
  • 5408.32.10.00 Other (624) (under: Mixed mainly or solely with wool or fine animal hair) (m², kg): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 80.5%.
  • 5408.32.30.00 Containing 30 percent or more by weight of silk or silk waste, valued over $33 per kg (618) (m², kg): General 6.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 80%.
  • 5408.32.90 Other (under: Other): General 15%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5408.32.90.10 Mixed mainly or solely with synthetic filaments (618) (m², kg).
  • 5408.32.90.20 Poplin or broadcloth (625) (under: Other) (m², kg).
  • 5408.32.90.30 Sheeting (627) (under: Other) (m², kg).
  • 5408.32.90.40 Printcloth (626) (under: Other) (m², kg).
  • 5408.32.90.50 Satin weave or twill weave (628) (m², kg).
  • 5408.32.90.90 Other (629) (under: Other) (m², kg).
  • 5408.33 Of yarns of different colors (under: Other woven fabrics).
  • 5408.33.05 Containing 36 percent or more by weight of wool or fine animal hair: General 19.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 48.5¢/kg + 68.5%.
  • 5408.33.05.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
  • 5408.33.05.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
  • 5408.33.10.00 Other (624) (under: Mixed mainly or solely with wool or fine animal hair) (m², kg): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 80.5%.
  • 5408.33.15.00 Containing 85 percent or more by weight of man-made filaments, the thread count of which per cm (treating multiple (folded) or cabled yarns as single threads) is over 69 but not over 142 in the warp and over 31 but not over 71 in the filling (618) (m², kg): General 12.3¢/kg + 11.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 24.3¢/kg + 81%.
  • 5408.33.30.00 Containing 30 percent or more by weight of silk or silk waste, valued over $33 per kg (618) (m², kg): General 6.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 80%.
  • 5408.33.90 Other (under: Other): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5408.33.90.10 Mixed mainly or solely with synthetic filaments or metalized yarn (618) (m², kg).
  • 5408.33.90.20 Poplin or broadcloth (625) (under: Other) (m², kg).
  • 5408.33.90.30 Sheeting(627) (under: Other) (m², kg).
  • 5408.33.90.40 Printcloth (626) (under: Other) (m², kg).
  • 5408.33.90.50 Satin weave or twill weave (628) (m², kg).
  • 5408.33.90.90 Other (629) (under: Other) (m², kg).
  • 5408.34 Printed (under: Other woven fabrics).
  • 5408.34.05 Containing 36 percent or more by weight of wool or fine animal hair: General Free; Special none; Column 2 48.5¢/kg + 68.5%.
  • 5408.34.05.10 Not combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
  • 5408.34.05.20 Combed (410) (under: Containing 36 percent or more by weight of wool or fine animal hair) (m², kg).
  • 5408.34.10.00 Other (624) (under: Mixed mainly or solely with wool or fine animal hair) (m², kg): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 80.5%.
  • 5408.34.30.00 Containing 30 percent or more by weight of silk or silk waste, valued over $33 per kg (618) (m², kg): General Free; Special none; Column 2 80%.
  • 5408.34.90 Other (under: Other): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5408.34.90.10 Mixed mainly or solely with synthetic filaments (618) (m², kg).
  • 5408.34.90.20 Poplin or broadcloth (625) (under: Other) (m², kg).
  • 5408.34.90.30 Sheeting(627) (under: Other) (m², kg).
  • 5408.34.90.40 Printcloth (626) (under: Other) (m², kg).
  • 5408.34.90.50 Satin weave or twill weave (628) (m², kg).
  • 5408.34.90.85 Discharge printed (629) (under: Other) (m², kg).
  • 5408.34.90.95 Other (629) (under: Other) (m², kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.