HTS Heading 6103
Men's or boys' suits, ensembles, suit-type jackets, blazers, trousers, bib and brace overalls, breeches and shorts (other than swimwear), knitted or crocheted
All 117 HTS codes under heading 6103 (men's or boys' suits), with their duty rates from the 2026 HTS Revision 23. General duty Free to 28.2%, some per unit.
Every line of heading 6103
- 6103 Men's or boys' suits, ensembles, suit-type jackets, blazers, trousers, bib and brace overalls, breeches and shorts (other than swimwear), knitted or crocheted.
- 6103.10 Suits (under: Men's or boys' suits, ensembles, suit-type jackets, blazers, trousers, bib and brace overalls, breeches and shorts (other than swimwear), knitted or crocheted).
- 6103.10.10.00 Of wool or fine animal hair (443) (No., kg): General 38.8¢/kg + 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 77.2¢/kg + 54.5%.
- 6103.10.20.00 Containing 23 percent or more by weight of wool or fine animal hair (443) (No., kg): General 60.3¢/kg + 15.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 77.2¢/kg + 54.5%.
- 6103.10.30.00 Other (643) (under: Of synthetic fibers) (No., kg): General 28.2%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 72%.
- 6103.10.40.00 Containing 23 percent or more by weight of wool or fine animal hair (443) (No., kg): General Free; Special none; Column 2 77.2¢/kg + 54.5%.
- 6103.10.50.00 Other (643) (under: Of artificial fibers) (No., kg): General Free; Special none; Column 2 72%.
- 6103.10.60 Of cotton (under: Of other textile materials): General 9.4%; Special Free (AU,BH, CL,CO, IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
- 6103.10.60.10 Jackets imported as parts of suits (333) (doz., kg).
- 6103.10.60.15 Trousers, breeches and shorts imported as parts of suits (347) (doz., kg).
- 6103.10.60.30 Waistcoats imported as parts of suits (359) (doz., kg).
- 6103.10.70.00 Containing 70 percent or more by weight of silk or silk waste (743) (No., kg): General 0.9%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 45%.
- 6103.10.90 Other (under: Of other textile materials): General 5.6%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 45%.
- 6103.10.90.10 Jackets imported as parts of suits (333) (doz., kg).
- 6103.10.90.20 Trousers, breeches, and shorts imported as parts of suits (347) (doz., kg).
- 6103.10.90.30 Waistcoats imported as parts of suits (359) (doz., kg).
- 6103.10.90.40 Subject to wool restraints (443) (No., kg).
- 6103.10.90.50 Subject to man-made fiber restraints (643) (No., kg).
- 6103.10.90.80 Other (843) (under: Other) (No., kg).
- 6103.22.00 Of cotton (under: Ensembles): General The rate applicable to each garment in the ensemble if separately entered; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 The rate applicable to each garment in the ensemble if separately entered.
- 6103.22.00.10 Garments described in heading 6101 (334) (doz., kg).
- 6103.22.00.20 Jackets and blazers described in heading 6103 (333) (doz., kg).
- 6103.22.00.30 Trousers and breeches (347) (under: Of cotton) (doz., kg).
- 6103.22.00.40 Shorts (347) (under: Of cotton) (doz., kg).
- 6103.22.00.50 Shirts (338) (under: Of cotton) (doz., kg).
- 6103.22.00.70 Sweaters (345) (under: Of cotton) (doz., kg).
- 6103.22.00.80 Other (359) (under: Of cotton) (doz., kg).
- 6103.23.00 Of synthetic fibers (under: Ensembles): General The rate applicable to each garment in the ensemble if separately entered; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 The rate applicable to each garment in the ensemble if separately entered.
- 6103.23.00.05 Garments described in heading 6101 (434) (doz., kg).
- 6103.23.00.07 Jackets and blazers described in heading 6103 (433) (doz., kg).
- 6103.23.00.10 Trousers, breeches and shorts (447) (doz., kg).
- 6103.23.00.25 Shirts (438) (under: Containing 23 percent or more by weight of wool or fine animal hair) (doz., kg).
- 6103.23.00.30 Sweaters (445) (under: Containing 23 percent or more by weight of wool or fine animal hair) (doz., kg).
- 6103.23.00.35 Other (459) (under: Containing 23 percent or more by weight of wool or fine animal hair) (doz., kg).
- 6103.23.00.36 Garments described in heading 6101 (634) (doz., kg).
- 6103.23.00.37 Jackets and blazers described in heading 6103 (633) (doz., kg).
- 6103.23.00.40 Trousers and breeches (647) (under: Other) (doz., kg).
- 6103.23.00.45 Shorts (647) (under: Other) (doz., kg).
- 6103.23.00.55 Bib and brace overalls (659) (under: Other) (doz., kg).
- 6103.23.00.70 Sweaters (645) (under: Other) (doz., kg).
- 6103.23.00.75 Shirts (638) (under: Other) (doz., kg).
- 6103.23.00.80 Other (659) (under: Other) (doz., kg).
- 6103.29 Of other textile materials (under: Ensembles).
- 6103.29.05 Of wool or fine animal hair (under: Of other textile materials): General The rate applicable to each garment in the ensemble if separately entered; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 The rate applicable to each garment in the ensemble if separately entered.
- 6103.29.05.10 Garments described in heading 6101 (434) (doz., kg).
- 6103.29.05.20 Jackets and blazers described in heading heading 6103 (433) (doz., kg).
- 6103.29.05.30 Trousers, breeches and shorts (447) (doz., kg).
- 6103.29.05.50 Shirts (438) (under: Of wool or fine animal hair) (doz., kg).
- 6103.29.05.60 Sweaters (445) (under: Of wool or fine animal hair) (doz., kg).
- 6103.29.05.70 Other (459) (under: Of wool or fine animal hair) (doz., kg).
- 6103.29.10 Of artificial fibers (under: Of other textile materials): General The rate applicable to each garment in the ensemble if separately entered; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 The rate applicable to each garment in the ensemble if separately entered.
- 6103.29.10.10 Garments described in heading 6101 (634) (doz., kg).
- 6103.29.10.15 Jackets and blazers described in heading 6103 (633) (doz., kg).
- 6103.29.10.20 Trousers and breeches (647) (under: Of artificial fibers) (doz., kg).
- 6103.29.10.30 Shorts (647) (under: Of artificial fibers) (doz., kg).
- 6103.29.10.40 Sweaters (645) (under: Of artificial fibers) (doz., kg).
- 6103.29.10.50 Shirts (638) (under: Of artificial fibers) (doz., kg).
- 6103.29.10.60 Other (659) (under: Of artificial fibers) (doz., kg).
- 6103.29.20 Other (under: Of other textile materials): General The rate applicable to each garment in the ensemble if separately entered; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 The rate applicable to each garment in the ensemble if separately entered.
- 6103.29.20.28 Containing 70 percent or more by weight of silk or silk waste (734) (doz., kg).
- 6103.29.20.30 Other (834) (under: Garments described in heading 6101) (doz., kg).
- 6103.29.20.34 Containing 70 percent or more by weight of silk or silk waste (733) (doz., kg).
- 6103.29.20.36 Other (833) (under: Jackets and blazers described in heading 6103) (doz., kg).
- 6103.29.20.40 Containing 70 percent or more by weight of silk or silk waste (747) (doz., kg).
- 6103.29.20.44 Trousers and breeches (847) (under: Other) (doz., kg).
- 6103.29.20.48 Shorts (847) (under: Other) (doz., kg).
- 6103.29.20.52 Containing 70 percent or more by weight of silk or silk waste (738) (doz., kg).
- 6103.29.20.54 Other (838) (under: Shirts) (doz., kg).
- 6103.29.20.58 Subject to cotton restraints (345) (doz., kg).
- 6103.29.20.60 Subject to wool restraints (445) (doz., kg).
- 6103.29.20.62 Subject to man-made fiber restraints (645) (doz., kg).
- 6103.29.20.64 Containing 70 percent or more by weight of silk or silk waste (745) (doz., kg).
- 6103.29.20.66 Assembled in Hong Kong from knit-to-shape component parts knitted elsewhere (846) (doz., kg).
- 6103.29.20.68 Other (846) (under: Other) (doz., kg).
- 6103.29.20.70 Assembled in Hong Kong from knit-to-shape component parts knitted elsewhere (845) (doz., kg).
- 6103.29.20.74 Other (845) (under: Other) (doz., kg).
- 6103.29.20.80 Containing 70 percent or more by weight of silk or silk waste (759) (doz., kg).
- 6103.29.20.82 Other (859) (under: Other) (doz., kg).
- 6103.31.00.00 Of wool or fine animal hair (433) (doz., kg): General 38.6¢/kg + 10%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 77.2¢/kg + 54.5%.
- 6103.32.00.00 Of cotton (333) (under: Suit-type jackets and blazers) (doz., kg): General 13.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
- 6103.33 Of synthetic fibers (under: Suit-type jackets and blazers).
- 6103.33.10.00 Containing 23 percent or more by weight of wool or fine animal hair (433) (doz., kg): General 38.6¢/kg + 10%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 77.2¢/kg + 54.5%.
- 6103.33.20.00 Other (633) (under: Of synthetic fibers) (doz., kg): General 28.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 72%.
- 6103.39 Of other textile materials (under: Suit-type jackets and blazers).
- 6103.39.10.00 Of artificial fibers (633) (under: Of other textile materials) (doz., kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 72%.
- 6103.39.40.00 Containing 70 percent or more by weight of silk or silk waste (733) (doz., kg): General 0.9%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 6103.39.80 Other (under: Of other textile materials): General 5.6%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 60%.
- 6103.39.80.10 Subject to cotton restraints (333) (doz., kg).
- 6103.39.80.20 Subject to wool restraints (433) (doz., kg).
- 6103.39.80.30 Subject to man-made fiber restraints (633) (doz., kg).
- 6103.39.80.60 Other (833) (under: Other) (doz., kg).
- 6103.41 Of wool or fine animal hair (under: Trousers, bib and brace overalls, breeches and shorts).
- 6103.41.10 Trousers, breeches and shorts: General 61.1¢/kg + 15.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 77.2¢/kg + 54.5%.
- 6103.41.10.10 Trousers and breeches (447) (under: Trousers, breeches and shorts) (doz., kg).
- 6103.41.10.20 Shorts (447) (under: Trousers, breeches and shorts) (doz., kg).
- 6103.41.20.00 Bib and brace overalls (459) (under: Of wool or fine animal hair) (doz., kg): General 13.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 54.5%.
- 6103.42 Of cotton (under: Trousers, bib and brace overalls, breeches and shorts).
- 6103.42.10 Trousers, breeches and shorts: General 16.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 45%.
- 6103.42.10.20 Men's (347) (under: Trousers and breeches) (doz., kg).
- 6103.42.10.35 Imported as parts of play suits (237) (doz., kg).
- 6103.42.10.40 Other (347) (under: Boys') (doz., kg).
- 6103.42.10.50 Men's (347) (under: Shorts) (doz., kg).
- 6103.42.10.65 Imported as parts of play suits (237) (doz., kg).
- 6103.42.10.70 Other (347) (under: Boys') (doz., kg).
- 6103.42.20 Bib and brace overalls (under: Of cotton): General 10.3%; Special Free (AU,BH,CL, CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
- 6103.42.20.10 Insulated, for cold weather protection(359) (doz., kg).
- 6103.42.20.15 Boys' sizes 2-7 (237) (under: Other) (doz., kg).
- 6103.42.20.25 Other (359) (under: Other) (doz., kg).
- 6103.43 Of synthetic fibers (under: Trousers, bib and brace overalls, breeches and shorts).
- 6103.43.10 Containing 23 percent or more by weight of wool or fine animal hair: General 58.5¢/kg + 15.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 77.2¢/kg + 54.5%.
- 6103.43.10.10 Trousers and breeches (447) (under: Containing 23 percent or more by weight of wool or fine animal hair) (doz., kg).
- 6103.43.10.20 Shorts (447) (under: Containing 23 percent or more by weight of wool or fine animal hair) (doz., kg).
- 6103.43.15 Other (under: Trousers, breeches and shorts): General 28.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 72%.
- 6103.43.15.20 Men's (647) (under: Trousers and breeches) (doz., kg).
- 6103.43.15.35 Imported as parts of play suits (237) (doz., kg).
- 6103.43.15.40 Other (647) (under: Boys') (doz., kg).
- 6103.43.15.50 Men's (647) (under: Shorts) (doz., kg).
- 6103.43.15.65 Imported as parts of play suits (237) (doz., kg).
- 6103.43.15.70 Other (647) (under: Boys') (doz., kg).
- 6103.43.20 Bib and brace overalls (under: Of synthetic fibers): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 72%.
- 6103.43.20.10 Containing 23 percent or more by weight of wool or fine animal hair (459) (doz., kg).
- 6103.43.20.15 Insulated, for cold weather protection (659) (doz., kg).
- 6103.43.20.20 Men's (659) (under: Other) (doz., kg).
- 6103.43.20.25 Boys' (659) (under: Other) (doz., kg).
- 6103.49 Of other textile materials (under: Trousers, bib and brace overalls, breeches and shorts).
- 6103.49.10 Trousers, breeches and shorts: General 28.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 72%.
- 6103.49.10.10 Containing 23 percent or more by weight of wool or fine animal hair (447) (doz., kg).
- 6103.49.10.20 Trousers and breeches (647) (under: Other) (doz., kg).
- 6103.49.10.60 Shorts (647) (under: Other) (doz., kg).
- 6103.49.20.00 Bib and brace overalls (659) (under: Of artificial fibers) (doz., kg): General 13.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 72%.
- 6103.49.40 Containing 70 percent or more by weight of silk or silk waste: General 0.9%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 35%.
- 6103.49.40.10 Trousers, breeches and shorts (747) (doz., kg).
- 6103.49.40.20 Bib and brace overalls (759) (under: Containing 70 percent or more by weight of silk or silk waste) (doz., kg).
- 6103.49.80 Other (under: Of other textile materials): General 5.6%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 35%.
- 6103.49.80.10 Subject to cotton restraints (347) (doz., kg).
- 6103.49.80.12 Subject to wool restraints (447) (doz., kg).
- 6103.49.80.14 Subject to man-made fiber restraints (647) (doz., kg).
- 6103.49.80.24 Trousers and breeches (847) (under: Other) (doz., kg).
- 6103.49.80.26 Shorts (847) (under: Other) (doz., kg).
- 6103.49.80.34 Subject to cotton restraints (359) (doz., kg).
- 6103.49.80.36 Subject to wool restraints (459) (doz., kg).
- 6103.49.80.38 Subject to man-made fiber restraints (659) (doz., kg).
- 6103.49.80.60 Other (859) (under: Bib and brace overalls) (doz., kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.