HTS Chapter 61
Articles of apparel and clothing accessories, knitted or crocheted
The 17 headings and 838 HTS codes of chapter 61 (knitted apparel), with their duty rates from the 2026 HTS Revision 23.
The 17 headings of chapter 61
- 6101: Men's or boys' overcoats, carcoats, capes, cloaks, anoraks (including ski-jackets), windbreakers and similar articles, knitted or crocheted, other than those of heading 6103 (12 codes, General duty 0.9% to 28.2%, some per unit)
- 6102: Women's or girls' overcoats, carcoats, capes, cloaks, anoraks (including ski-jackets), windbreakers and similar articles, knitted or crocheted, other than those of heading 6104 (12 codes, General duty 0.9% to 28.2%, some per unit)
- 6103: Men's or boys' suits, ensembles, suit-type jackets, blazers, trousers, bib and brace overalls, breeches and shorts (other than swimwear), knitted or crocheted (117 codes, General duty Free to 28.2%, some per unit)
- 6104: Women's or girls' suits, ensembles, suit-type jackets, blazers, dresses, skirts, divided skirts, trousers, bib and brace overalls, breeches and shorts (other than swimwear), knitted or crocheted (175 codes, General duty Free to 28.2%, some per unit)
- 6105: Men's or boys' shirts, knitted or crocheted (13 codes, General duty 0.9% to 32%)
- 6106: Women's or girls' blouses and shirts, knitted or crocheted (19 codes, General duty 0.9% to 32%)
- 6107: Men's or boys' underpants, briefs, nightshirts, pajamas, bathrobes, dressing gowns and similar articles, knitted or crocheted (24 codes, General duty 0.8% to 16%)
- 6108: Women's or girls' slips, petticoats, briefs, panties, night dresses, pajamas, negligees, bathrobes, dressing gowns and similar articles, knitted or crocheted (34 codes, General duty 0.6% to 16%)
- 6109: T-shirts, singlets, tank tops and similar garments, knitted or crocheted (35 codes, General duty 2.6% to 32%)
- 6110: Sweaters, pullovers, sweatshirts, waistcoats (vests) and similar articles, knitted or crocheted (123 codes, General duty 0.9% to 32%)
- 6111: Babies' garments and clothing accessories, knitted or crocheted (33 codes, General duty Free to 32%)
- 6112: Track suits, ski-suits and swimwear, knitted or crocheted (54 codes, General duty 3.5% to 28.2%)
- 6113: Garments, made up of knitted or crocheted fabrics of heading 5903, 5906 or 5907 (19 codes, General duty 3.8% to 7.1%)
- 6114: Other garments, knitted or crocheted (47 codes, General duty 0.9% to 32%)
- 6115: Panty hose, tights, stockings, socks and other hosiery, including graduated compression hosiery (for example, stockings for varicose veins) and footwear without applied soles, knitted or crocheted (32 codes, General duty Free to 18.8%)
- 6116: Gloves, mittens and mitts, knitted or crocheted (45 codes, General duty Free to 23.5%, some per unit)
- 6117: Other made up clothing accessories, knitted or crocheted; knitted or crocheted parts of garments or of clothing accessories (44 codes, General duty 1.2% to 14.6%)
Where it sits in the schedule
Chapter 61 is in Section XI of the Harmonized System, textiles and apparel (chapters 50 to 63). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.