HTS Heading 6105

Men's or boys' shirts, knitted or crocheted

All 13 HTS codes under heading 6105 (men's or boys' shirts), with their duty rates from the 2026 HTS Revision 23. General duty 0.9% to 32%.

Every line of heading 6105

  • 6105 Men's or boys' shirts, knitted or crocheted.
  • 6105.10.00 Of cotton (under: Men's or boys' shirts, knitted or crocheted): General 19.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 6105.10.00.10 Men's (338) (under: Of cotton) (doz., kg).
  • 6105.10.00.20 Imported as parts of playsuits (237) (doz., kg).
  • 6105.10.00.30 Other (338) (under: Boys') (doz., kg).
  • 6105.20 Of man-made fibers (under: Men's or boys' shirts, knitted or crocheted).
  • 6105.20.10.00 Containing 23 percent or more by weight of wool or fine animal hair (438) (doz., kg): General 13.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 54.5%.
  • 6105.20.20 Other (under: Of man-made fibers): General 32%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 72%.
  • 6105.20.20.10 Men's (638) (under: Other) (doz., kg).
  • 6105.20.20.20 Imported as parts of playsuits (237) (doz., kg).
  • 6105.20.20.30 Other (638) (under: Boys') (doz., kg).
  • 6105.90 Of other textile materials (under: Men's or boys' shirts, knitted or crocheted).
  • 6105.90.10.00 Of wool or fine animal hair (438) (doz., kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 54.5%.
  • 6105.90.40.00 Containing 70 percent or more by weight of silk or silk waste (738) (doz., kg): General 0.9%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 60%.
  • 6105.90.80 Other (under: Of other textile materials): General 5.6%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 60%.
  • 6105.90.80.10 Subject to cotton restraints (338) (doz., kg).
  • 6105.90.80.20 Subject to wool restraints (438) (doz., kg).
  • 6105.90.80.30 Subject to man-made fiber restraints (638) (doz., kg).
  • 6105.90.80.60 Other (838) (under: Other) (doz., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.