HTS Heading 6109

T-shirts, singlets, tank tops and similar garments, knitted or crocheted

All 35 HTS codes under heading 6109 (T-shirts, singlets), with their duty rates from the 2026 HTS Revision 23. General duty 2.6% to 32%.

Every line of heading 6109

  • 6109 T-shirts, singlets, tank tops and similar garments, knitted or crocheted.
  • 6109.10.00 Of cotton (under: T-shirts, singlets, tank tops and similar garments, knitted or crocheted): General 16.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6109.10.00.04 T-shirts, all white, short hemmed sleeves, hemmed bottom, crew or round neckline, or V-neck with a mitered seam at the center of the V, without pockets, trim or embroidery (352) (doz., kg).
  • 6109.10.00.07 Singlets, all white, without pockets, trim or embroidery (352) (doz., kg).
  • 6109.10.00.11 Thermal undershirts (352) (under: Men's or boys') (doz., kg).
  • 6109.10.00.12 Men's (338) (under: Other T-shirts) (doz., kg).
  • 6109.10.00.14 Boys' (338) (under: Other T-shirts) (doz., kg).
  • 6109.10.00.18 Men's (338) (under: Tank tops and other singlets) (doz., kg).
  • 6109.10.00.23 Boys' (338) (under: Tank tops and other singlets) (doz., kg).
  • 6109.10.00.27 Other (338) (under: Men's or boys') (doz., kg).
  • 6109.10.00.37 Underwear (352) (under: Women's or girls') (doz., kg).
  • 6109.10.00.40 Women's (339) (under: T-shirts) (doz., kg).
  • 6109.10.00.45 Girls' (339) (under: T-shirts) (doz., kg).
  • 6109.10.00.60 Women's (339) (under: Tank tops) (doz., kg).
  • 6109.10.00.65 Girls' (339) (under: Tank tops) (doz., kg).
  • 6109.10.00.70 Other (339) (under: Other) (doz., kg).
  • 6109.90 Of other textile materials (under: T-shirts, singlets, tank tops and similar garments, knitted or crocheted).
  • 6109.90.10 Of man-made fibers (under: Of other textile materials): General 32%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6109.90.10.07 Men's (638) (under: T-shirts) (doz., kg).
  • 6109.90.10.09 Boys' (638) (under: T-shirts) (doz., kg).
  • 6109.90.10.13 Men's (638) (under: Tank tops and singlets) (doz., kg).
  • 6109.90.10.25 Boys' (638) (under: Tank tops and singlets) (doz., kg).
  • 6109.90.10.47 Thermal undershirts (652) (under: Men's or boys') (doz., kg).
  • 6109.90.10.49 Other (638) (under: Men's or boys') (doz., kg).
  • 6109.90.10.50 Women's (639) (under: T-shirts) (doz., kg).
  • 6109.90.10.60 Girls' (639) (under: T-shirts) (doz., kg).
  • 6109.90.10.65 Women's (639) (under: Tank tops and singlets) (doz., kg).
  • 6109.90.10.70 Girls' (639) (under: Tank tops and singlets) (doz., kg).
  • 6109.90.10.75 Thermal undershirts (652) (under: Women's or girls') (doz., kg).
  • 6109.90.10.90 Other (639) (under: Women's or girls') (doz., kg).
  • 6109.90.15 Of wool, with long sleeves (under: Of other textile materials): General 5.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 55.5%.
  • 6109.90.15.10 Underwear (459) (under: Men's or boys') (doz., kg).
  • 6109.90.15.20 Other (438) (under: Men's or boys') (doz., kg).
  • 6109.90.15.30 Underwear (459) (under: Women's or girls') (doz., kg).
  • 6109.90.15.40 Other (438) (under: Women's or girls') (doz., kg).
  • 6109.90.40 Containing 70 percent or more by weight of silk or silk waste: General 2.6%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6109.90.40.10 Men's or boys' (738) (under: Containing 70 percent or more by weight of silk or silk waste) (doz., kg).
  • 6109.90.40.20 Women's or girls' (739) (under: Containing 70 percent or more by weight of silk or silk waste) (doz., kg).
  • 6109.90.80 Other (under: Of other textile materials): General 16%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6109.90.80.10 Men's or boys' (838) (under: Other) (doz., kg).
  • 6109.90.80.20 Of wool (438) (under: Women's or girls') (doz., kg).
  • 6109.90.80.30 Other (838) (under: Women's or girls') (doz., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.