HTS Heading 6111

Babies' garments and clothing accessories, knitted or crocheted

All 33 HTS codes under heading 6111 (babies' garments), with their duty rates from the 2026 HTS Revision 23. General duty Free to 32%.

Every line of heading 6111

  • 6111 Babies' garments and clothing accessories, knitted or crocheted.
  • 6111.20 Of cotton (under: Babies' garments and clothing accessories, knitted or crocheted).
  • 6111.20.10.00 Blouses and shirts, except those imported as parts of sets (239) (doz., kg): General 19.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6111.20.20.00 T-shirts, singlets and similar garments, except those imported as parts of sets (239) (doz., kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6111.20.30.00 Sweaters, pullovers, sweatshirts, waistcoats (vests) and similar articles, except those imported as parts of sets (239) (doz., kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6111.20.40.00 Dresses (239) (under: Of cotton) (doz., kg): General 11.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 45%.
  • 6111.20.50.00 Trousers, breeches and shorts, except those imported as parts of sets (239) (doz., kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6111.20.60 Other (under: Other): General 8.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6111.20.60.10 Sunsuits, washsuits and similar apparel (239) (doz., kg).
  • 6111.20.60.20 Sets (239) (under: Other) (doz., kg).
  • 6111.20.60.30 Imported as parts of sets (239) (doz., kg).
  • 6111.20.60.50 Babiesʼ socks and booties (239) (doz. prs., kg).
  • 6111.20.60.70 Other (239) (under: Other) (doz., kg).
  • 6111.30 Of synthetic fibers (under: Babies' garments and clothing accessories, knitted or crocheted).
  • 6111.30.10.00 Trousers, breeches and shorts, except those imported as parts of sets (239) (doz., kg): General 28.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6111.30.20.00 Blouses and shirts, except those imported as parts of sets (239) (doz., kg): General 32%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6111.30.30.00 T-shirts, singlets and similar garments, except those imported as parts of sets (239) (doz., kg): General 32%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6111.30.40.00 Sweaters, pullovers, sweatshirts, waistcoats (vests) and similar articles, except those imported as parts of sets (239) (doz., kg): General 30%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6111.30.50 Other (under: Of synthetic fibers): General 16%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6111.30.50.10 Sunsuits, washsuits and similar apparel (239) (doz., kg).
  • 6111.30.50.15 Blanket sleepers (239) (under: Other) (doz., kg).
  • 6111.30.50.20 Sets (239) (under: Other) (doz., kg).
  • 6111.30.50.30 Imported as parts of sets (239) (doz., kg).
  • 6111.30.50.50 Babiesʼ socks and booties (239) (doz. prs., kg).
  • 6111.30.50.70 Other (239) (under: Other) (doz., kg).
  • 6111.90 Of other textile materials (under: Babies' garments and clothing accessories, knitted or crocheted).
  • 6111.90.05 Of wool or fine animal hair (under: Of other textile materials): General 13.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 78.5%.
  • 6111.90.05.10 Sweaters, pullovers, sweatshirts, waistcoats (vests) and similar articles (439) (doz., kg).
  • 6111.90.05.30 Other (439) (under: Of wool or fine animal hair) (doz., kg).
  • 6111.90.10.00 Trousers, breeches and shorts, except those imported as parts of sets (239) (doz., kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6111.90.20.00 Blouses and shirts, except those imported as parts of sets (239) (doz., kg): General 17.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6111.90.30.00 T-shirts, singlets and similar garments, except those imported as parts of sets (239) (doz., kg): General Free; Special none; Column 2 90%.
  • 6111.90.40.00 Sweaters, pullovers, sweatshirts, waistcoats (vests) and similar except those imported as parts of sets (239) (doz., kg): General 26%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6111.90.50 Other (under: Of artificial fibers): General 14.9%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6111.90.50.10 Sunsuits, playsuits and washsuits (239) (doz., kg).
  • 6111.90.50.20 Sets (239) (under: Other) (doz., kg).
  • 6111.90.50.30 Imported as parts of sets (239) (doz., kg).
  • 6111.90.50.50 Babiesʼ socks and booties (239) (doz. prs., kg).
  • 6111.90.50.70 Other (239) (under: Other) (doz., kg).
  • 6111.90.70.00 Containing 70 percent or more by weight of silk or silk waste (doz., kg): General 0.9%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 60%.
  • 6111.90.90.00 Other (839) (under: Of other textile materials) (doz., kg): General 5.6%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 60%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.