HTS Heading 6113

Garments, made up of knitted or crocheted fabrics of heading 5903, 5906 or 5907

All 19 HTS codes under heading 6113 (garments), with their duty rates from the 2026 HTS Revision 23. General duty 3.8% to 7.1%.

Every line of heading 6113

  • 6113.00 Garments, made up of knitted or crocheted fabrics of heading 5903, 5906 or 5907.
  • 6113.00.10 Having an outer surface impregnated, coated, covered, or laminated with rubber or plastics material which completely obscures the underlying fabric: General 3.8%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 65%.
  • 6113.00.10.05 Men's or boys' (under: Coats and jackets) (doz., kg).
  • 6113.00.10.10 Women's or girls' (under: Coats and jackets) (doz., kg).
  • 6113.00.10.12 Other (under: Having an outer surface impregnated, coated, covered, or laminated with rubber or plastics material which completely obscures the underlying fabric) (doz., kg).
  • 6113.00.90 Other (under: Garments, made up of knitted or crocheted fabrics of heading 5903, 5906 or 5907): General 7.1%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 65%.
  • 6113.00.90.15 Men's or boys' (334) (under: Of cotton) (doz., kg).
  • 6113.00.90.20 Women's or girls' (335) (under: Of cotton) (doz., kg).
  • 6113.00.90.25 Men's or boys' (634) (under: Other) (doz., kg).
  • 6113.00.90.30 Women's or girls' (635) (under: Other) (doz., kg).
  • 6113.00.90.38 Men's or boys' (347) (under: Of cotton) (doz., kg).
  • 6113.00.90.42 Women's or girls (348) (under: Of cotton) (doz., kg).
  • 6113.00.90.44 Men's or boys' (647) (under: Other) (doz., kg).
  • 6113.00.90.52 Women's or girls' (648) (under: Other) (doz., kg).
  • 6113.00.90.55 Men's or boys' (359) (under: Of cotton) (doz., kg).
  • 6113.00.90.60 Women's or girls' (359) (under: Of cotton) (doz., kg).
  • 6113.00.90.65 Men's or boys' (659) (under: Other) (doz., kg).
  • 6113.00.90.70 Women's or girls' (659) (under: Other) (doz., kg).
  • 6113.00.90.74 Men's or boys' (359) (under: Of cotton) (doz., kg).
  • 6113.00.90.82 Women's or girls' (359) (under: Of cotton) (doz., kg).
  • 6113.00.90.84 Men's or boys' (659) (under: Other) (doz., kg).
  • 6113.00.90.86 Women's or girls' (659) (under: Other) (doz., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.