HTS Heading 6213
Handkerchiefs
All 6 HTS codes under heading 6213 (handkerchiefs), with their duty rates from the 2026 HTS Revision 23. General duty 1.1% to 13.2%.
Every line of heading 6213
- 6213 Handkerchiefs.
- 6213.20 Of cotton (under: Handkerchiefs).
- 6213.20.10.00 Hemmed, not containing lace or embroidery (330) (doz., kg): General 13.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 58%.
- 6213.20.20.00 Other (330) (under: Of cotton) (doz., kg): General 7.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 75%.
- 6213.90 Of other textile materials (under: Handkerchiefs).
- 6213.90.05.00 Containing 70 percent or more by weight of silk or silk waste (doz., kg): General 1.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 6213.90.07.00 Other (859) (under: Of silk or silk waste) (doz., kg): General 3.8%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 60%.
- 6213.90.10.00 Of man-made fibers (630) (under: Of other textile materials) (doz., kg): General 10.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
- 6213.90.20.00 Other (859) (under: Of other textile materials) (doz., kg): General 5.3%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 51.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.