HTS Heading 6214

Shawls, scarves, mufflers, mantillas, veils and the like

All 7 HTS codes under heading 6214 (shawls, scarves, mufflers, mantillas), with their duty rates from the 2026 HTS Revision 23. General duty 1.2% to 11.3%.

Every line of heading 6214

  • 6214 Shawls, scarves, mufflers, mantillas, veils and the like.
  • 6214.10 Of silk or silk waste (under: Shawls, scarves, mufflers, mantillas, veils and the like).
  • 6214.10.10.00 Containing 70 percent or more by weight of silk or silk waste (doz., kg): General 1.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,NP,OM,P,PA,PE,S,SG); Column 2 65%.
  • 6214.10.20.00 Other (859) (under: Of silk or silk waste) (doz., kg): General 3.9%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,NP,OM, P,PA,PE,S,SG); Column 2 65%.
  • 6214.20.00.00 Of wool or fine animal hair (459) (doz., kg): General 6.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,NP,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6214.30.00.00 Of synthetic fibers (659) (under: Shawls, scarves, mufflers, mantillas, veils and the like) (doz., kg): General 5.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6214.40.00.00 Of artificial fibers (659) (under: Shawls, scarves, mufflers, mantillas, veils and the like) (doz., kg): General 5.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,NP,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6214.90.00 Of other textile materials (under: Shawls, scarves, mufflers, mantillas, veils and the like): General 11.3%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,NP,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6214.90.00.10 Of cotton (359) (under: Of other textile materials) (doz., kg).
  • 6214.90.00.90 Other (859) (under: Of other textile materials) (doz., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.