HTS Heading 6215
Ties, bow ties and cravats
All 7 HTS codes under heading 6215 (ties, bow ties and cravats), with their duty rates from the 2026 HTS Revision 23. General duty 5% to 12.7%, some per unit.
Every line of heading 6215
- 6215 Ties, bow ties and cravats.
- 6215.10.00 Of silk or silk waste (under: Ties, bow ties and cravats): General 7.2%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 65%.
- 6215.10.00.25 Containing 50 percent or more by weight (including any linings and interlinings) of textile materials other than silk or silk waste (659) (doz., kg).
- 6215.10.00.40 With outer shell containing 70 percent or more by weight of silk or silk waste (758) (doz., kg).
- 6215.10.00.90 Other (858) (under: Containing less than 50 percent by weight (including any linings and interlinings) of textile materials other than silk or silk waste) (doz., kg).
- 6215.20.00.00 Of man-made fibers (659) (under: Ties, bow ties and cravats) (doz., kg): General 24.8¢/kg + 12.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 26.5¢/kg +65%.
- 6215.90.00 Of other textile materials (under: Ties, bow ties and cravats): General 5%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 52%.
- 6215.90.00.10 Of wool or fine animal hair (459) (doz., kg).
- 6215.90.00.15 Of cotton (359) (under: Of other textile materials) (doz., kg).
- 6215.90.00.20 Other (858) (under: Of other textile materials) (doz., kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.